Site Preparation | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Andy J. Long
|
|
|
10 AM with RP Roger and Brandt Hospitality superintendant Angela ###-####
Two construction entrances, silt fence perimeter on 3 lower sides of site, placed pit run in site to keep mud down. Grass and trees around the cleared area have been preserved. Water truck, sweeper, and dumpster have been staged. Receiving storm drains (private & MS4) have sediment protection installed. Responsible Person on duty. Will post Boise ESC permit sign on Rifleman and on trailer.
Approved for construction,
|