INSP-Final Inspection | 8/13/2001 | 8/13/2001 | 8/13/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 8/13/2001 8:19:44 AM
|
INSP-Sprinkler Rough-in | 12/29/2000 | 12/29/2000 | 12/29/2000 | A | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 12/29/2000 2:39:37 PM Spklr rough in West side. Fail Four items to correct
|
INSP-Sprinkler Rough-in/Hydro | 12/27/2000 | 12/28/2000 | 12/28/2000 | P | PART |
Joe Tawney
|
|
|
###-####. OK on hydro test of new spklr system for West side of bldg 12/29/2000 2:31:28 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Joe Tawney
|
|
|
###-####. OK spklr rough in on McDonalds and hydro test of riser #4 11/16/2000 7:59:16 AM
|
INSP-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Joe Tawney
|
|
|
###-####. OK on both entry ways 11/8/2000 8:02:17 AM
|
INSP-Final Inspection | 11/2/2000 | 11/3/2000 | 11/3/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. 11/2/2000 12:30:02 PM Fail on rough in of new West entry.Resubmittal required 11/6/2000 7:57:31 AM
|
INSP-Final Inspection | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 13:36:38. Contact: ###-####. REinsp. fail entry way visable over spaces 7/31/00 4:31:23 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 16:28:35. Contact: ###-####. OK on hydro test for subs area C/N issued for spklr. R/I 7/27/00 1:54:40 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | FAIL |
Joe Tawney
|
|
|
ANN-- ###-#### HYDRO Not ready reschedule to 7/27/00 7/26/00 1:16:17 PM
|
INSP-Sprinkler Rough-in | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | PART |
Joe Tawney
|
|
|
Ann ###-#### ok on partial garden area spklr rough in 6/29/00 10:10:14 AM
|