Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR00-00431
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 8455 W WESTPARK ST
Project NameSPR SCP GLOBAL TECH-456
Customer Number 
ePlanReview 
Description
SCP GLOBAL TECHNOLOGIES (BLDG 456) PHASE I - Interior demolition of walls & finishes done under BLD00-01363. To remodel interior by increasing the clean room area & relocate the access stairs to the lower level clean room mechanical / air return; relocate return air chases in clean room; expand the assembly fabrication area into the previous lunch / breakroom / office / restroom areas; relocate D/I Plan Filter Wall and double doors / infill wall opening; add BCF Room; relocate and upgrade fire sprinkler for needs & code compliance including suspended ceiling system. NOTE: This building is fully fire sprinklered for area increase. All sprinkler work per UFC 1997, BCO, Fire Department requirements. Installation shall conform to related NFPA adopted pamphlets. THE NEW ADDITION(S) TO THE NORTH AND CONNECTION BETWEEN BUILDINGS 455 & 456 WITH ANY INTERIOR WORK SHOWN ON ANY PLANS ARE NOT PART OF THIS PROJECT SCOPE. SEPARATE APPLICATION AND PLANS ARE CURRENTLY BEING REVIEWED, **JWA**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/12/20019/12/20019/12/2001PPASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/12/2001 3:33:23 PM
INSP-Sprinkler Rough-in7/25/20007/25/20007/25/2000APART
DetailsJoe Tawney
OK on sprinkler R/I of NW corner of building.