INSP-Final Inspection | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 9/7/2001 2:43:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PART |
Rick Jackson
|
|
|
leroy ###-#### hydro need to complete sway bracing; 911 sticker 8/28/2001 7:09:46 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | NR |
Rick Jackson
|
|
|
leroy ###-#### hydro rescheduled for 8/27/01 per Leroy of Shilo 8/23/2001 2:18:52 PM
|
INSP-Sprinkler Rough-in | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 8/10/2001 3:24:23 PM racking not complete; due to changes in the racking requested resubmittals for the changes 8/13/2001 2:51:17 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 13:41:04. Contact: ###-####. earthquaking not complete; overspaced at 2nd floor near elevator and stairs; rack sprinklers not complete 8/10/2001 3:26:00 PM
|
INSP-Sprinkler Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Rick Jackson
|
|
|
stub in\\###-#### underground permit not approved; this permit is for the overhead 3/6/2001 3:11:48 PM
|