INSP-Final Inspection | 3/4/2002 | 3/4/2002 | 3/4/2002 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/4/2002 10:51:22 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/4/2002 | 3/4/2002 | 3/4/2002 | A | CANC |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/4/2002 10:51:49 AM
|
INSP-Final Inspection | 2/25/2002 | 2/28/2002 | 2/28/2002 | A | FAIL |
Rick Jackson
|
|
|
###-#### need to locate inspectors test for flow switch; retest flow switch; need ceiling tiles in several areas; need record of completion; sign on door of riser room 2/28/2002 9:06:15 AM
|
INSP-Alarm Testing | 2/21/2002 | 2/25/2002 | 2/25/2002 | P | NR |
Rick Jackson
|
|
|
###-#### galem will reshedule 2/25/2002 4:47:54 PM
|
INSP-Final Inspection | 9/14/2001 | 9/18/2001 | 9/18/2001 | A | FAIL |
Rick Jackson
|
|
|
deliah-- ###-#### c/n issued; stopped test when elevator recall didn't work 9/18/2001 4:04:59 PM
|
FIR-Aging Inspection | 7/18/2001 | 7/18/2001 | 7/18/2001 | | NR |
Rick Jackson
|
|
|
work in progress 7/18/2001 11:21:09 AM
|