Permit NumberFIR01-00066
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 1111 -15 W GROVE ST
Project NameSPR CTA ARCHITECTS BLD
Customer Number 
ePlanReviewNo
Description
*CTA ARCHITECTS-ENGINEERS* To install a new Ordinary Group 2 fire sprinkler system in coordination with the remodel a 24,400 ft/2 existing building for a new tenant space that will occupy 3,884 ft/2 on the 2nd floor, for an architects office. The remaining lease space is vacant. Facility will have 2 new exit stairs, installation of a core area, restrooms and an elevator, new tenant demising wall, construction of a nonrated corridor, new gypboard ceiling for the architects office. The 6,284 ft/2 remaining vacant tenant spaces will not be finished or occupied at this time. Possible separate fire permits to finish and occupancy may be required. NOTE: This building is fully fire sprinklered per NFPA 13 for area increase. All fire sprinkler work shall be per NFPA 13, UFC and BCO, as regulated by the Fire Department. Building Permit is: BLD00-00771. *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/6/20016/6/20016/6/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 6/6/2001 2:35:09 PM
INSP-Sprinkler Rough-in/Hydro5/1/20015/2/20015/2/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/01/2001 at 14:24:52. Contact: ###-####. need FDC location adjusted to maintain 3 foot clearance; above and underground hydro okay 5/2/2001 10:20:56 AM
INSP-Sprinkler Rough-in/Hydro4/23/20014/24/20014/24/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/23/2001 at 13:08:12. Contact: ###-####. high temp heads at heaters; standard response head in elevator machine room; earthquaking needed in several areas as noted on plans; review notes indicate 155 temp heads - need designer input 4/24/2001 9:34:52 AM
INSP-Supply line flush4/24/20014/24/20014/24/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 4/24/2001 9:33:20 AM
INSP-Supply line flush4/23/20014/24/20014/23/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/23/2001 at 11:40:12. Contact: ###-####. cover inspection - okay to cover 4/23/2001 2:00:57 PM
INSP-Supply line flush4/18/20014/19/20014/18/2001ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/18/2001 at 08:35:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/18/2001 at 13:13:46.
INSP-Conference3/6/20013/6/20013/6/2001PPART
DetailsRick Jackson
Paul ###-#### called contractor and he wanted to know if he could rock some hallways as the sprinkler piping will still be viewable - rocking approved 3/6/2001 3:37:48 PM