Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR01-00099
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 945 N MAPLE GROVE RD
Project NameSPR LINGER LONGER BLD 1
Customer Number 
ePlanReview 
Description
BUILDING # 1 - TYPE C * TO FIRE SPRINKLER A NEW 23,060 FT/2, THREE STORY, WOOD FRAMED, 24 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 7,688 FT/2 AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR THREE BEDROOM UNITS, THE SECOND FLOOR IS 7,200 FT/2 AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, THREE BEDROOM UNITS. THE THIRD FLOOR IS 7,200 FT/2 AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR ONE BEDROOM UNITS. ALL FIRE SPRINKLER WORK PER THE APPROVED PLANS, UFC, BCO AND RELATED, ADOPTED NFPA PAMPHLETS, AS REGULATED BY THE FIRE DEPARTMENT. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. BUILDING PERMIT IS: BLD00-02822. *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Supply line flush8/17/20018/20/20018/20/2001APASS
DetailsJoe Tawney
OK on underground hydro test 8/20/2001 12:07:01 PM
INSP-Final Inspection8/16/20018/17/20018/17/2001AFAIL
DetailsJoe Tawney
Final Fail need UG hydro test and Spklr head in riser room 8/17/2001 2:16:56 PM
INSP-Sprinkler Rough-in/Hydro7/13/20017/16/20017/16/2001PPART
DetailsJoe Tawney
Ok on above ground hydro test and supply line flush 7/16/2001 3:14:28 PM
INSP-Sprinkler Rough-in/Hydro7/12/20017/13/20017/13/2001PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/12/2001 at 13:59:51. Contact: ###-####.
INSP-Supply line flush7/12/20017/13/20017/13/2001PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/12/2001 at 13:59:18. Contact: ###-####.
INSP-Supply line flush7/2/20017/3/20017/3/2001ACANC
DetailsJoe Tawney
Cancel Leak in line 7/3/2001 10:54:23 AM
INSP-Sprinkler Rough-in5/29/20015/30/20015/30/2001APART
DetailsJoe Tawney
###-#### Spklr rough in OK to cover 5/30/2001 9:31:08 AM