Permit Information
Permit NumberFIR01-00143
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 8000 FEDERAL WAY
Project NameSPR MIC 24E-TENANT
Customer Number 
ePlanReview 
Description
MICRON BUILDING 24E TENANT IMPROVEMENT FOR LAB (B24E) * TO INSTALL COMPLETE FIRE SPRINKLER (OVERHEAD) SYSTEMS, TO FINISH MICRON FABRICATION BUILDING LABORATORY BUILDING 24E FOR OCCUPANCY (EXCEPT THE RISERS). THIS PERMIT WILL INCLUDE THE INSTALLATION OF ALL NECESSARY MATERIAL AND EQUIPMENT TO COMPLETE THIS BUILDING FOR FULL OPERATION (EXCEPT THE RELATED RISERS). BUILDING #24E CONSISTS OF A 19,200 FT/2 BASEMENT LEVEL CONTAINING RESTROOMS, OFFICE AND LAB AREAS; AND A 24,100 FT/2 FIRST FLOOR CONTAINING OFFICE, LAB AND CHEMICAL STORAGE AREAS. THIS BUILDING REQUIRES FULL FIRE SPRINKLER PROTECTION. THE SPRINKLERS ARE USED FOR AREA INCREASE (UBC). ALL FIRE SPRINKLER DESIGN, INSTALLATION AND RELATED WORK SHALL BE PER THE APPROVED PLANS, ATTACHED COMMENT LIST, NFPA13, 72 (AND OTHER RELATED AND ADOPTED PAMPHLETS), AS REGULATED BY THE FIRE DEPARTMENT. THIS PERMIT IS ATTACHED TO: BLD01-00143. THE SHELL BUILDING WAS CONSTRUCTED UNDER PERMIT BLD00-01988. *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/20/20022/20/20022/20/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 2/20/2002 4:17:31 PM
INSP-Final Inspection12/18/200112/19/200112/19/2001ACANC
DetailsRick Jackson
###-#### hydro test not a final inspection 12/19/2001 12:31:59 PM
INSP-Sprinkler Rough-in/Hydro12/19/200112/19/200112/19/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 12/19/2001 12:31:37 PM hydro okay for all 24E systems
INSP-Sprinkler Rough-in9/19/20019/24/20019/24/2001APART
DetailsRick Jackson
###-#### ROY hydro okay on areas 6 ground level and 5-6 interstitial 9/24/2001 9:08:50 AM
INSP-Sprinkler Rough-in8/29/20018/30/20018/30/2001APART
DetailsRick Jackson
r/i ###-####- roy hydro test okay partial; ned heads in gas room under duct work; requires additional earthquaking 8/30/2001 11:17:46 AM
INSP-Sprinkler Rough-in/Hydro8/27/20018/29/20018/29/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/27/2001 at 13:51:11. Contact: ###-####. will reschedule 8/29/2001 1:08:04 PM
INSP-Sprinkler Rough-in/Hydro8/14/20018/15/20018/15/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/14/2001 at 09:03:24. Contact: ###-####. hydro okay on sub fab areas 5-6 only. need heads installed; earthquaking; straps on hangers 8/15/2001 2:30:11 PM
FIR-Aging Inspection8/9/20018/9/20018/9/2001 NR
DetailsRick Jackson
work in progress 8/9/2001 3:26:20 PM