INSP-Final Inspection | 12/28/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/28/2001 10:01:23 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/8/2001 8:27:54 AM 24 hour air test okay
|
INSP-Sprinkler Rough-in/Hydro | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/2/2001 1:54:36 PM hydro and r/i okay
|
INSP-Conference | 4/18/2001 | 4/19/2001 | 4/19/2001 | P | PART |
Rick Jackson
|
|
|
Rick ###-#### discussed locations of the required three standpipe locations in the horizontal exit 4/19/2001 2:51:33 PM
|