INSP-Supply line flush | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Troy Cobbley
|
|
|
Underground flush Ok. Underground hydro OK. 10/24/2001 8:27:49 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2001 | 10/17/2001 | 10/16/2001 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 15:43:34. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/16/2001 at 16:25:05.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | CANC |
Joe Tawney
|
|
|
cancelled by contractor 10/5/2001 1:00:12 PM
|
INSP-Supply line flush | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | CANC |
Joe Tawney
|
|
|
cancelled by contractor 10/5/2001 1:00:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover spklr supply line 6/20/2001 3:25:51 PM
|