Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR01-00387
StatusFinaled
Name C&S FIRE PROTECTION INC
Site Address 4848 N FIVE MILE RD
Project NameSPR COVENANT PRESBYTERIAN
Customer Number 
ePlanReview 
Description
Covenant Presbyterian Church * To install a complete fire sprinkler system in a 6,046 ft/2 one story sddition for a Sanctuary which is separated with a two-hour area separation wall, and a 672 ft/2 one story addition to the existing building for restrooms. Other work which may be involved is remodeling and upgrading existing building to V-1hr per approved plans and attachments. This permit is attached to BLD01-00144. Fire sprinklers are used for one-hour substitution. All work shall be per the UFC, BCO, NFPA 13-1999, 24-1995, 72-1999 as regulated by the fire department. *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/7/200111/7/200111/7/2001PPASS
DetailsTroy Cobbley
Fire sprinkler system finaled. OK for perm occ. 11/7/2001 1:01:17 PM
INSP-Final Inspection10/22/200110/23/200110/23/2001ANR
DetailsTroy Cobbley
Fire alarm system not active. Inspection to be rescheduled. 10/24/2001 8:21:29 AM
INSP-Sprinkler Rough-in/Hydro9/27/20019/28/20019/28/2001APART
DetailsJoe Tawney
hydo's OK. duct & beam blockage to be fixed in crawlspace 9/28/2001 4:59:15 PM
INSP-Final Inspection9/27/20019/28/20019/27/2001PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 09/27/2001 at 11:17:46. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/27/2001 at 11:21:02.
INSP-Supply line flush9/6/20019/7/20019/7/2001APART
DetailsJoe Tawney
Ok on supply line and FDC flush 9/7/2001 12:16:30 PM
INSP-Supply line flush8/30/20018/31/20018/31/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/30/2001 at 16:56:13. Contact: ###-####. FDC okay to cover; will to ball drip in crawl space 8/31/2001 2:15:52 PM
INSP-Supply line flush8/28/20018/29/20018/29/2001APART
DetailsJoe Tawney
OK to cover supply line. Still need to pour thrust block at riser 8/29/2001 10:21:28 AM
INSP-Sprinkler Rough-in/Hydro8/22/20018/23/20018/23/2001PPART
DetailsJoe Tawney
Ok on rough in of mostof 1st flr. Provide protection under combustable canopy at front entrance 8/23/2001 4:46:50 PM
INSP-Sprinkler Rough-in/Hydro8/2/20018/3/20018/3/2001PPART
DetailsJoe Tawney
OK on hydro test of audio room behind stage. One head will not cover upstairs area behind stage 8/3/2001 2:44:08 PM
INSP-Sprinkler Rough-in/Hydro8/2/20018/3/20018/3/2001PPART
DetailsJoe Tawney
OK hydro test of audio room behind stage. Need two heads in second level of audio area 8/6/2001 7:55:59 AM
INSP-Sprinkler Rough-in/Hydro7/20/20017/23/20017/23/2001PPART
DetailsJoe Tawney
OK above ground hydro test for West half of sanctuary 7/23/2001 5:23:32 PM
INSP-Final Inspection7/18/20017/19/20017/19/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/18/2001 at 15:19:10. Contact: ###-####. not a final but a hydro inspection of the west side. Fitting broke and hydro failed
INSP-Sprinkler Rough-in/Hydro7/16/20017/17/20017/17/2001APART
DetailsJoe Tawney
Ok on above ground hydro test for East half of sanctuary 7/17/2001 5:00:50 PM