INSP-Final Inspection | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Troy Cobbley
|
|
|
finaled
|
INSP-Final Inspection | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Troy Cobbley
|
|
|
finaled
|
INSP-Final Inspection | 7/10/2002 | 7/11/2002 | 7/11/2002 | P | CANC |
Troy Cobbley
|
|
|
not all of the work is complete (windows changed out) 7/11/2002 2:57:02 PM
|
INSP-Final Inspection | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Troy Cobbley
|
|
|
fire sprinkler system given temp per Dave Miller for the window sprinklers
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide spare sprinkler heads per note 16, provide canopies for pendants, provide additional hangers in conference rooms, provide canopies and ceiling tile in all elevator lobbies, tag risers, provide approval for the window sprinklers and meet requirements 6/18/2002 12:27:11 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/14/2002 | 6/17/2002 | 6/17/2002 | A | PART |
Troy Cobbley
|
|
|
Hydro test of both FDCs and the 1st floor dry system OK. 6/17/2002 3:46:37 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | PASS |
Troy Cobbley
|
|
|
4th floor hydro test OK, OK to cover pool area and small south side dry system 3/29/2002 3:04:14 PM
|
INSP-Sprinkler Rough-in | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/11/2002 2:42:54 PM 2nd floor rough-in OK. OK to cover
|
FIR-Aging Inspection | 2/1/2002 | 2/1/2002 | 2/1/2002 | | NR |
Troy Cobbley
|
|
|
work in progress 2/1/2002 11:39:27 AM
|
INSP-Sprinkler Rough-in | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Troy Cobbley
|
|
|
3rd floor rough-in OK 2/1/2002 8:24:06 AM
|
INSP-Sprinkler Rough-in | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection 1/31/2002 4:25:41 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2002 | 1/25/2002 | 1/25/2002 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/25/2002 11:07:08 AM Attic dry system rough-in Ok now that difficiencies are corrected. 4th floor wet system rough-in OK. Tenting/boxes over some 4th floor pipe to be inspected later
|
INSP-Sprinkler Rough-in/Hydro | 1/22/2002 | 1/23/2002 | 1/23/2002 | P | FAIL |
Troy Cobbley
|
|
|
Attic dry system hydro failed 1/23/2002 3:33:31 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/23/2002 3:36:00 PM Rough-in OK for the attic system. Contractor to relocate two upright sprinkler heads at east end. Left notice with General Contractor that draft stops and sheer walls need to be installed to separate sprinkler heads that are too close down mechanical corridor
|