Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR01-00418
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 7155 W DENTON
Project NameSPR AAA OREGON/ID OFF. U.G.
Customer Number 
ePlanReview 
Description
AAA OREGON/IDAHO OFFICE BUILDING-UNDERGROUND * To install a of new Post Indicator control valve at the property line and 6" C-900 underground fire service line, tapped off existing (size not provided, but appears to be 8" off United Water system plan) water line supply in Denton Street, which runs approximately 68'-0" southeast and approximately 20'-0" southeast. Supply piping into this new structure will be approximately Ductile Iron installed underneath the footing and up through the floor, (elevation not provided) but should be approximately 6" from face of flange to the floor. Also included is an FDC supply line, consisting of 4" Ductile Iron. The FDC ball drip shall be accessible from an approved pit or box for inspection and/or repairs. This fire service is required fire protection in a new 14,120 ft/2, one story, steel framed, type V-N office shell. All underground work, installation and materials to be per plan and these documents, meeting the requirements of UFC, NFPA 24-1995 and 13-1999, all as regulated by the fire department. This permit is attached to: BLD01-00361. OH fire sprinkler permit will be issued separate. *JWA*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/17/20021/18/20021/18/2002APASS
DetailsTroy Cobbley
Underground sprinkler line finaled 1/17/2002 2:00:48 PM
INSP-Sprinkler Rough-in/Hydro12/18/200112/20/200112/20/2001APASS
DetailsTroy Cobbley
above ground, underground and FDC hydro tests OK 12/20/2001 4:00:42 PM
INSP-Supply line flush12/18/200112/19/200112/19/2001APASS
DetailsTroy Cobbley
Supply line flush OK 12/19/2001 11:15:34 AM
INSP-Sprinkler Rough-in/Hydro8/8/20018/9/20018/9/2001AFAIL
DetailsJoe Tawney
FDC piping to vlv box, Thrust plates on wrong side of wall 8/9/2001 11:15:12 AM
INSP-Sprinkler Rough-in/Hydro8/7/20018/7/20018/7/2001PPART
DetailsJoe Tawney
OK to cover supply line FDC piping yet to be completed 8/7/2001 3:52:27 PM
INSP-Sprinkler Rough-in8/6/20018/6/20018/6/2001PFAIL
DetailsJoe Tawney
Fail Do not cover Did not have access to permit 8/6/2001 3:31:54 PM