INSP-Final Inspection | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/12/2002 1:16:28 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PASS |
Rick Jackson
|
|
|
TRENT ###-####
|
INSP-Supply line flush | 3/11/2002 | 3/12/2002 | 3/12/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 12:25:12. Contact: ###-####. flow still very low 3/12/2002 4:26:52 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 09:28:00. Contact: ###-####. okay ro cover - r/i okay; still need hydro; underground will need flush and hydro 1/29/2002 3:01:56 PM
|
INSP-Supply line flush | 1/11/2002 | 1/14/2002 | 1/15/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/11/2002 2:15:53 PM received a call from Dan with Shilo. He said the other underground supplies were flushed and they produced a lot more water than this one and they will proceed with other trouble shooting to determine why this flush is so low on flow 1/15/2002 11:50:37 AM
|
INSP-Supply line flush | 1/10/2002 | 1/11/2002 | 1/11/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 14:02:42. Contact: ###-####. very limited flow on underground flush. shilo to retest other buildings up stream from this building on monday 1/14 1/11/2002 2:15:30 PM
|
INSP-Sprinkler Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Rick Jackson
|
|
|
###-#### underground flush only - pass 10/10/2001 3:15:35 PM
|
INSP-Sprinkler Rough-in | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | NR |
Rick Jackson
|
|
|
mike ###-#### underground
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 08:16:36. Contact: ###-####. underground okay to cover 8/17/2001 1:10:23 PM
|