Permit Number | FIR01-00444 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE
|
Site Address |
11311 W CHINDEN BLVD
|
Project Name | SPR H-P (CHEMICAL SERVICE) |
Customer Number | |
ePlanReview | |
Description |
(H-P CHEMICAL SERVICE BUILDING, PART OF HEWLETT-PACKARD BUILDING 6-WEST) To remodel, upgrade, modify the fire sprinkler system protection within an 9,072 ft/2, portion of the existing 45,913 ft/2, 1st & 2nd stories (41,718 main / 4195 2nd levels, 9600 ft/2 basement, of building #6-West. This project involves creating rooms & areas for use as storage and distribution of hazardous materials to serve the "H-6" occupancy, fabrication area located in H.P. #6-East. Includes the upgrade of existing firewalls between "H" to "H" occupancies and "H" to "B/S1" occupancies". The fire suppression sprinkler system and related alarm notification systems shall conform with current adopted City of Boise codes and ordinances, UFC 1997, NFPA 13-1999, approved plans, notes and attached plan review conditions as regulated by the Fire Department. NOTE: The entire HP Building #6 (East - West 1st & 2nd floors & basement) is listed as currently sprinklered. Hazardous Materials Inventory Statement provided by Winslow Partnership is used to establish UBC & UFC requirements. A"Certificate of Occupancy" for the entire HP#6- E/W Occupancy is required at the final approval of the Chem Storage & Nickel Plating / Fabrication expansion project. This fire permit is attached to BLD01-01169.
|