Permit Number | FIR01-00460 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE
|
Site Address |
2999 N LAKEHARBOR LN
|
Project Name | SPR IDAHO ATHLETIC CLUB 2 & 3 |
Customer Number | |
ePlanReview | |
Description |
IDAHO ATHLETIC CLUB ADDITION (PHASES II & III) - TO EXTEND AND MAKE REQUIRED CHANGES TO THE EXISTING FIRE SPRINKLER SYSTEM, INSTALLED UNDER PHASE 1 (FIR01-00125) INTO THE FINAL TWO PHASES OF THE NEW IDAHO ATHLETIC CLUB. PHASE II IS A 11,700 FT/2, TWO STORY ADDITION AT THE WEST SIDE OF THE EXISTING PHASE 1. THE FIRST FLOOR OF PHASE TWO IS A SHELL AND CORE FOR THE FUTURE POOL ROOM. THE SECOND FLOOR WILL BE FINISHED AS AN EXERCISE ROOM. FIRST FLOOR: 5,850 FT/2, SECOND FLOOR: 5,850 FT/2. PHASE THREE IS A 10,370 FT/2, TWO STORY ADDITION AT THE EAST SIDE OF THE EXISTING PHASE 1 BUILDING. THE FIRST FLOOR IS A SHELL ONLY FOR FUTURE OFFICE AND RETAIL SPACE. THE SECOND FLOOR IS A SHELL ONLY FOR A FUTURE EXERCISE ROOM. FIRST FLOOR: 5,270 FT/2, SECOND FLOOR: 5,100 FT/2. BOTH PHASES ARE MASONRY EXTERIOR WALL, CONCRETE FLOORS AND STRUCTURAL ROOF FRAMING WITH METAL ROOF DECK. ALL PHASES OF THIS BUILDING ARE FULLY FIRE SPRINKLERED. THE SPRINKLERS ARE BEING USED FOR ONE-HOUR SUBSTITUTION. FIRE SPRINKLERS INSTALLATION IS PER PLANS, ATTACHED REVIEW NOTES, UFC-1997, NFPA 13-1999, 72-1999 AND ADOPTED BOISE CITY ORDINANCES, ALL AS REGULATED BY THE BOISE FIRE DEPARTMENT. THIS PERMIT IS ATTACHED TO BLD01-01014.
|