INSP-Final Inspection | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/14/2001 3:24:09 PM Fire sprinkler system finaled. OK for perm occ
|
INSP-Final Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/1/2001 11:08:25 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2001 | 10/30/2001 | 10/30/2001 | P | PASS |
Troy Cobbley
|
|
|
Left correction notice. Install hose station outlet, pendents overspace in corr. 110, pendents not installed in restroom and computer room, taped heads in restroom, hangers missing, FDC leaking, install alarm bell, verify test orfice matches head, provide letter stating heads are installed in canopies. 10/31/2001 9:19:52 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Troy Cobbley
|
|
|
Above ground hydro OK. No approved plans for roughin inspection 10/12/2001 2:43:57 PM
|