SHORELINE APARTMENT * Section 1 of 2, east section * (A two hour area separation wall divides this 54 unit apartment building into two separate buildings). This portion is 3 stories with mezzanine, wood framed, 31,329 ft/2, 36 unit apartment building above a three hour occupancy separation meeting the requirements of UBC Section 311.2.2.1.
Section 2 of 2, west section portion is 3 stories with mezzanine, wood framed, 15,9400 ft/2, 18 unit apartment building, above a three hour occupancy separation meeting the requirements of UBC Section 311.2.2.1.
The parking garage is 17,700 ft/2, with a three hour occupancy separation per UBC Section 311.2.2.1. below a 54 unit apartment building. The exterior openings meet UBC Section 311.9.2.2 for open parking garage ventilation requirements. The north wall of the existing apartment building is a four-hour area separation wall, with openings, which does not meet the "Building Separation" for fire-flow reduction requirements referenced in UFC Division III, Appendix III-A:4.2 from the now attached existing structure.
The entire facility, requires fire protection, which includes an NFPA 13-1999 system in the parking structure. The residential apartments shall be designed to the minimum standard of NFPA 13R-1999. Also included is the installation of a Class 1 Standpipe System, installed in all exit stairwells, meeting the minimum design requirements of NFPA 14-1999. All required per the UFC, and as regulated by the Fire Department.
Underground fire line installation was permitted under: FIR01-00322. Building parking garage level is attached to permit BLD01-00011. East Apartment Section 1 of 2, is under building permit BLD01-00808. West Apartment Section 2 of 2, is under building permit BLD01-00809. (JWA)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/10/20025/10/20025/10/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/10/2002 4:26:17 PM
INSP-Final Inspection5/2/20025/3/20025/3/2002AFAIL
DetailsRick Jackson
###-#### call first need Bill to review clacs; wrong temp heads in garage; caps on standpipes; signs on riser room; 5/3/2002 4:35:47 PM
INSP-Final Inspection5/1/20025/2/20025/2/2002ACANC
DetailsRick Jackson
fire fn- bruce ###-#### Darrell of Tytan scheduled for alarm testing on 5/3 5/2/2002 2:17:37 PM
INSP-Final Inspection4/29/20024/30/20024/30/2002ACANC
DetailsTroy Cobbley
Bruce called and said that the fire alarm was not ready 4/30/2002 2:21:17 PM
INSP-Sprinkler Rough-in/Hydro4/19/20024/22/20024/22/2002APART
DetailsRick Jackson
r/i bruce ###-#### hydro okay for standpipe 4/22/2002 12:27:13 PM
INSP-Supply line flush3/20/20023/21/20023/21/2002APART
DetailsRick Jackson
bruce-- ###-#### underground flush only 3/21/2002 9:58:24 AM
INSP-Final Inspection2/13/20022/14/20022/14/2002AFAIL
DetailsRick Jackson
###-#### not a final inspection; hydro okay on overhead 2/14/2002 11:07:57 AM
INSP-Sprinkler Rough-in/Hydro2/14/20022/14/20022/14/2002APART
DetailsRick Jackson
Added by Inspector: 409 On 2/14/2002 11:08:25 AM hydro on overhead okay
FIR-Aging Inspection2/1/20022/1/20022/1/2002 NR
DetailsRick Jackson
wip 2/1/2002 9:53:55 AM
INSP-Sprinkler Rough-in12/12/200112/13/200112/14/2001AFAIL
DetailsRick Jackson
###-#### c/n issued: standpipe submittals required; 3/4 inch lines used to feed under stairs on third floor require calc's; 4 inch main in basement needed per calcs 12/14/2001 11:11:41 AM