INSP-Final Inspection | 3/8/2002 | 3/8/2002 | 3/8/2002 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/8/2002 8:38:28 AM corrections completed. Fire alarm system finaled
|
INSP-Final Inspection | 2/14/2002 | 2/19/2002 | 2/19/2002 | A | FAIL |
Troy Cobbley
|
|
|
Contractor to verify batteries are correctly sized in NAC panels (current draw exceeded plans), NAC panels not reporting loss of AC, NAC panel AC is not hardwired (verify requirement) 2/19/2002 1:26:25 PM
|
INSP-Final Inspection | 1/31/2002 | 2/4/2002 | 2/4/2002 | A | FAIL |
Troy Cobbley
|
|
|
relocate manual pull stations per note #12, test all fire sprinkler riser devices, provide a strobe in restroom 54, provide sign on FACP room door, provide review note #7 voltage measurements with inspector, inspection stopped at this point and will be continued. 2/4/2002 3:04:00 PM
|