Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR01-00522
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 6140 W CURTISIAN AVE Unit: #200 & #300
Project NameSPR ST AL'S MOB #6, 2 & 3 FLR.
Customer Number 
ePlanReview 
Description
(ST ALPHONSUS MOB #6-IDAHO CARDIOLOGY ASSOCIATES-2ND & 3RD FLOORS) Modify existing system and add sprinklers in a new, 31,172 ft/2, Light Hazard Occupancy tenant, located on entire second and third floors of building shell, permitted under BLD00-01744 for a (UFC - B occupancy) medical office use and (UFC I-1.2 occupancy) ambulatory/outpatient surgery center use. All work per approved plans on file and attached comment list, meeting the UFC and related NFPA pamphlets, as regulated by the Fire Department. Each floor is approximately 15,586 ft/2. Work to include two-hour rated occupancy separation between B and I-1.2 occupancies, new two-hour rated stair shaft for new interior stairway between the 2nd and 3rd floors, fire resistive materials on new steel structural members at new stair opening, new one-hour fire rated exit corridor, one-hour rated medical gas room in basement of building, restrooms and showers, interior walls, access floor system in one room, suspended ceiling installation. This fire permit is attached to building permit: FIR01-01172.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection2/1/20022/1/20022/1/2002 NR
DetailsTroy Cobbley
work in progress 2/1/2002 8:55:10 AM
INSP-Sprinkler Rough-in/Hydro1/23/20021/23/20021/23/2002PPASS
DetailsTroy Cobbley
hydro test for the 2nd floor T.I. is OK 1/23/2002 4:45:30 PM
INSP-Sprinkler Rough-in/Hydro1/9/20021/9/20021/9/2002PPART
DetailsTroy Cobbley
Added by Inspector: 430 On 1/9/2002 2:15:47 PM Ok to install ceiling tile in rooms with heads cut in at this date. I notified contractor to call for reinspection for all other areas when sprinkler heads are installed
INSP-Final Inspection1/8/20021/8/20021/8/2002PPART
DetailsTroy Cobbley
Third floor hydro test OK. OK to install ceiling tiles. 3rd floor shell system and T.I. hangers OK 1/8/2002 4:04:45 PM
FIR-Aging Inspection1/7/20021/7/20021/7/2002 NR
DetailsTroy Cobbley
work in progress 1/7/2002 3:52:14 PM