INSP-Final Inspection | 4/23/2002 | 4/23/2002 | 4/23/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PASS |
Troy Cobbley
|
|
|
Underground, overhead sprinkler and anti-freeze loop hydro tests OK 4/12/2002 3:52:32 PM
|
INSP-Supply line flush | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | PASS |
Troy Cobbley
|
|
|
flush on underground piping OK 4/10/2002 12:48:45 PM
|
INSP-Supply line flush | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | CANC |
Troy Cobbley
|
|
|
canceled by contractor 4/9/2002 4:25:28 PM
|
INSP-Supply line flush | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | FAIL |
Troy Cobbley
|
|
|
nut and bolt need to be coated before cover up 3/15/2002 12:21:08 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/11/2002 | 3/12/2002 | 3/11/2002 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 11:14:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/11/2002 at 14:18:36.
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2002 | 2/26/2002 | 2/26/2002 | P | FAIL |
Troy Cobbley
|
|
|
add hangers in north rooms and in corridor 2/26/2002 5:04:43 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PART |
Troy Cobbley
|
|
|
reception hall OK for cover 2/8/2002 3:26:58 PM
|
INSP-Sprinkler Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/6/2002 8:34:55 AM The front canopy attic heads to be relocated to within 6" of centerline of peak. Sunroom sprinklers OK for cover
|
INSP-Sprinkler Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PART |
Troy Cobbley
|
|
|
Front canopy OK for cover but approved plans not available 2/5/2002 12:34:23 PM
|