INSP-Final Inspection | 11/8/2004 | 11/8/2004 | 11/8/2004 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Final Inspection | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | FAIL |
Rick Jackson
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Dry system under walkway trip test okay; need straps on two hangers near stair; need air gauge at dry valve 10/11/2004 1:49:57 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2004 | 10/6/2004 | 10/6/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/6/2004 at 10:50:55 AM. Contact: ###-####. hydro on dry system under walkway okay 10/6/2004 12:59:01 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | FAIL |
Rick Jackson
|
|
|
Stop air test 43 psi Fail - air pressure at 38 psi 10/5/2004 11:44:21 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | DONE |
Rick Jackson
|
|
|
Start 24 hour test 12 pm with 43 psi on dry system under old walkway 10/4/2004 1:37:18 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/17/2004 | 9/17/2004 | 9/17/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/17/2004 at 8:14:52 AM. Contact: ###-####. Okay in area D and E; the temp walkway dry system is not ready and will require all tests; the walkway sprinkler system must remain in service up until the demo time 9/17/2004 11:47:29 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2004 | 9/15/2004 | 9/15/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/15/2004 at 8:42:06 AM. Contact: ###-####. ^ inch main from pump room to concourse B hydro only okay 9/15/2004 2:35:24 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | PART |
Rick Jackson
|
|
|
Dry system for under terminal and walkway okay for hydro; 30 minutes to fill with air at 42 psi 9/10/2004 4:28:49 PM
|
INSP-Sprinkler Rough-in | 9/8/2004 | 9/8/2004 | 9/8/2004 | A | FAIL |
Rick Jackson
|
|
|
Dry system air compressor takes over 30 minutes to fill system; need to trip dry system and set air compressor to come on above low air setting 9/8/2004 11:58:33 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 10:38:54 AM. Not holding pressure (second floor at SW corner) 9/3/2004 2:19:41 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/31/2004 | 9/1/2004 | 9/1/2004 | A | PART |
Rick Jackson
|
|
|
Brian; 8:00 Hydro okay for east mechanical room, area D 1st floor and area E basement through 1st floor elevator area 9/1/2004 12:33:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/30/2004 | 8/31/2004 | 8/31/2004 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 2:49:20 PM. Contact: ###-####. Rescheduled by inspector for 9/1 8/31/2004 3:06:37 PM
|
INSP-Sprinkler Rough-in | 8/6/2004 | 8/6/2004 | 8/6/2004 | A | FAIL |
Rick Jackson
|
|
|
Overspaced in roof mechanical room at grid F/5 - G/4 and 9-10 (only area checked) 8/6/2004 10:30:29 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2004 | 8/6/2004 | 8/6/2004 | A | PART |
Rick Jackson
|
|
|
Brian - ###-#### Hydro on west mechanical room on roof okay 8/6/2004 1:15:18 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2004 | 8/5/2004 | 8/5/2004 | P | NR |
Rick Jackson
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Hydro not holding - rescheduled for 8/6 8/5/2004 2:09:39 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2004 | 7/27/2004 | 7/27/2004 | A | PART |
Rick Jackson
|
|
|
Area C hydro completed 7/27/2004 2:00:37 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2004 | 7/26/2004 | 7/26/2004 | P | PART |
Rick Jackson
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Hydro on area C okay; EQ at (3-6 inch lines) expansion joint on second level okay 7/26/2004 2:58:31 PM
|
INSP-Sprinkler Rough-in | 6/8/2004 | 6/9/2004 | 6/10/2004 | A | PART |
Rick Jackson
|
|
|
###-#### brian okay to cover rotunda only; EQ needed at area by new walkway 6/10/2004 8:53:53 AM
|
INSP-Sprinkler Rough-in | 5/26/2004 | 5/26/2004 | 5/26/2004 | P | PART |
Troy Cobbley
|
|
|
Sprinkler pendants located in area "C" on the second floor west of the sky lights are ok to cover 5/26/2004 3:16:42 PM
|
INSP-Sprinkler Rough-in | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | FAIL |
Rick Jackson
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need EQ on 4 inch on either side of skylight as they are overspaced 5/12/2004 11:26:04 AM
|
INSP-Sprinkler Rough-in | 4/19/2004 | 4/19/2004 | 4/19/2004 | P | PART |
Rick Jackson
|
|
|
The 2.5 inch line in area D first floor has shifted from plans and branch lines installed per plans; need EQ at west end of 2.5 inch on first floor as it is overspaced from end of pipe; the tie-ins to exsisting mains aren't completed; okay on first floor area C and D - heads/drops not completed 4/19/2004 3:06:57 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/3/2003 | 6/4/2003 | 6/4/2003 | P | PART |
Rick Jackson
|
|
|
air test on three systems //// air tests okay; will need map updated to reflect current room numbers; system not left on and operational as it is not monitored by BOI personnel 6/4/2003 2:35:39 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/3/2003 | 6/3/2003 | 6/3/2003 | P | PART |
Rick Jackson
|
|
|
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore started 24 hr test on three systems 6/3/2003 4:01:51 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/28/2003 | 5/28/2003 | 5/28/2003 | P | PASS |
Troy Cobbley
|
|
|
sam; Phone #: ###-#### Hydro test for dry system area "B" is ok 5/28/2003 4:00:07 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Rick Jackson
|
|
|
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore tripped dry system to baggae handling area - trip time 1 minute; tampers and low air didn't report to fire panel; will need to reverify these signals for proper monitoring 5/23/2003 2:21:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Rick Jackson
|
|
|
hydro test on second floor area A and C; first floor area C; wet and preaction area B 5/8/2003 4:17:14 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2003 | 4/11/2003 | 4/11/2003 | P | PART |
Rick Jackson
|
|
|
SAM ###-#### area A and C on third floor hydro okay 4/11/2003 3:44:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/24/2003 | 3/25/2003 | 3/25/2003 | A | PART |
Rick Jackson
|
|
|
sam; Phone #: ###-#### Internet Inspection Request from: Annette Moore hydro okay on first floor Area A. 3/25/2003 10:11:08 AM
|
INSP-Sprinkler Rough-in | 3/11/2003 | 3/11/2003 | 3/11/2003 | P | PART |
Rick Jackson
|
|
|
sam; Phone #: ###-#### Internet Inspection Request from: Annette Moore tested pump with TVFP and Russ of Nickerson 3/11/2003 4:30:02 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/13/2003 | 2/14/2003 | 2/14/2003 | P | PART |
Rick Jackson
|
|
|
sam; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie hydro okay on basement, feed mains and header in basement; preaction for computer room; future main feeds 2/14/2003 3:19:56 PM
|
INSP-Sprinkler Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Rick Jackson
|
|
|
###-#### okay to cover area between rotunda and ticket area; need fireproofing in spots 2/7/2003 2:17:17 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/31/2003 at 9:26:33 AM. Contact: ###-####. will need heads in bottom of shaft on first floor' catwalk area okay 1/31/2003 3:12:22 PM
|
INSP-Sprinkler Rough-in | 1/10/2003 | 1/10/2003 | 1/10/2003 | A | FAIL |
Rick Jackson
|
|
|
heads below 22 inches and numerous obstructed in Area A in catwalk area for baggage handling system
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2002 | 12/17/2002 | 12/17/2002 | P | PART |
Rick Jackson
|
|
|
SAM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie antifreeze system and temp walkway areas are completed; hydro okay; tampers tested okay under FIR02-00480 12/18/2002 7:31:30 AM
|
INSP-Sprinkler Rough-in/Hydro | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | PART |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung hydro on temp walkway and r/i; will relocate heads at new wall as they are overspaced and at new room in temp wlakway 12/13/2002 4:06:19 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Rick Jackson
|
|
|
###-#### 12/10/2002 10:45:25 AM r/i for temp walkway okay; hydro okay 12/10/2002 2:41:50 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2002 | 12/3/2002 | 12/3/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 13:21:53. Contact: ###-####. verified resubmittal on the skylight area; okay per plans; will need to verify that heads aren't painted 12/3/2002 11:35:16 AM
|
INSP-Sprinkler Rough-in | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | PART |
Rick Jackson
|
|
|
area okay in concourse A for new bathroom 10/14/2002 9:25:27 AM
|
INSP-Final Inspection | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/10/2002 at 13:11:25. Contact: ###-####. rescheduled for 10/14 10/11/2002 4:46:19 PM
|
INSP-Sprinkler Rough-in | 9/26/2002 | 9/26/2002 | 9/26/2002 | P | FAIL |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung control valves on 1st, 2nd and 3rd floors are located above ceiling; first floor area A is located within baggage conveyor area 9/26/2002 4:12:22 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/04/2002 at 13:28:58. Contact: ###-####. heads obstructed/overspaced in basement mechanical; refer room; janitor room; EQ branch line in south room; add line and head in south room as shown on plans; heads painted in computer room; heads fire proofed in service corridor; temp walk way off concourse okay to cover; combustibles in concealed space by phone area; okay to cover mechanical chase on third floor 9/5/2002 11:05:16 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2002 | 7/3/2002 | 7/3/2002 | P | FAIL |
Rick Jackson
|
|
|
SAM ###-#### heads obstructed in basement at west end mechanical; will continue r/i 7/3/2002 3:45:40 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | NR |
Rick Jackson
|
|
|
SAM ###-#### Sam didn't have the latest approved a job shack; talked to Greg on phone and they will have plans for pm inspection on 7/3/02 7/2/2002 3:52:43 PM
|
INSP-Sprinkler Rough-in | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 1/14/2002 2:14:54 PM checked hangers in basement and retaining straps are installed where fireproofing is going to be applied this week.
|