INSP-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Rick Jackson
|
|
|
per agreement with Dave Miller and BFD the freight elevator is not required to have elevator recall 2/24/2003 1:21:15 PM
|
INSP-Alarm Testing | 2/10/2003 | 2/13/2003 | 2/13/2003 | A | FAIL |
Rick Jackson
|
|
|
Would Like to schedule for Thursday at 9:AM. Thanks Rick.; Phone #: ###-#### Internet Inspection Request from: Rick Groom all outstanding items corrected; awaiting letter with FD approval that the north elevator is okay without having recall; it is pre 1993 and wasn't required to have recall at time of installation 2/13/2003 3:13:46 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2003 | 1/30/2003 | 1/30/2003 | P | FAIL |
Rick Jackson
|
|
|
Would like the inspection for 1pm if possible. If not please let me know.
Thanks Rick Groom Northwest Sales Co.; Phone #: ###-#### Internet Inspection Request from: Rick Groom need to verify proper air flow for duct detectors in plenum on 14th floor; need updated map reflecting initiating devices and address; need circuit breaker location at NAC panels; need label on doors for RA detectors located in restrooms as detectors are concealed; retest fire phones for 9-14 floors; need to test elevator recall 1/31/2003 7:59:38 AM
|
FIR-Aging Inspection | 12/27/2002 | 12/27/2002 | 1/3/2003 | | PART |
Rick Jackson
|
|
|
Talked to Dave Maxwell and he said they will schedule for next week for testing 1/3/2003 8:59:12 AM
|