INSP-Final Inspection | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 4/18/2002 6:37:14 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2002 | 4/16/2002 | 4/16/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 11:53:32. Contact: ###-####. okay to cover; will hydro the entire floor when all TI areas are complete 4/16/2002 2:01:11 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2002 | 4/10/2002 | 4/10/2002 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 16:37:48. Contact: ###-####. work still in progress 4/10/2002 9:14:13 AM
|