Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR02-00143
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 6898 S SUPPLY WAY
Project NameSANDHILL INDUSTRIES
Customer Number 
ePlanReview 
Description
SMITH/HOSAC INDUSTRIAL SHELL BUILDING - TO INSTALL A COMPLETE HIGH PILED STORAGE SYSTEM IN A NEW 22,200 FT/2, ONE STORY, PRE-MANUFACTURED STEEL SHELL BUILDING. THIS BUILDING IS PROPOSED FOR USE AS A MANUFACTURING/WAREHOUSE AND OFFICE USE. INSTALLATION SHALL COMPLY WITH PLANS AND ATTACHED COMMENT LIST. THE UNDERGROUND FIRE SPRINKLER SUPPLY MAIN WAS REVIEWED UNDER FIR02-00136. THIS BUILDING IS FULLY SPRINKLERED FOR ALLOWABLE AREA INCREASE. THE FIRE SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13-1999, RED-LINED PLANS, ATTACHED REVIEW COMMENT AND CONDITIONS LIST; AS REGULATED BY THE FIRE CHIEF. AN APPROVED AND STAMPED PLAN, PERMIT AND FIRE "INSPECTION CARD" IS REQUIRED ON SITE AS A CONDITION OF THIS PERMIT, TO PROVIDE WITNESS OF COMPLIANCE TO THIS WORK. THIS PERMIT IS ATTACHED TO BLD02-00552.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/24/20025/24/20025/24/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 5/24/2002 12:55:57 PM
INSP-Conference5/20/20025/20/20025/20/2002PPART
DetailsRick Jackson
Added by Inspector: 409 On 5/20/2002 3:43:19 PM met with Terry and he provided the test data on the Victaulic manifold; it appears to be tested with a control valve and 90 degree elbow and it appears to meet criteria as installed
INSP-Sprinkler Rough-in/Hydro5/17/20025/17/20025/17/2002PPART
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/17/2002 9:05:59 AM hydro test okay; need flow switch and tamper control valve on hose station as indicated on approved plans; flow switch within 24 inches of control valve; awaiting alarm installation and testing; outside bell not installed 5/17/2002 3:51:24 PM