INSP-Final Inspection | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Troy Cobbley
|
|
|
fire finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | CANC |
Troy Cobbley
|
|
|
inspection was for the above ground hydro test and has been passed under FIR02-00304 10/17/2002 10:50:30 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | CANC |
Troy Cobbley
|
|
|
inspection was for the overhead rough-in and the entry was made under FIR02-00304 10/16/2002 4:00:14 PM
|
INSP-Supply line flush | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PASS |
Troy Cobbley
|
|
|
underground supply line flush and hydro test OK 8/30/2002 10:40:36 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/15/2002 | 5/15/2002 | 5/15/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/15/2002 8:23:29 AM underground only - okay to cover; PIV installed as shown on plans 5/15/2002 10:25:01 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Troy Cobbley
|
|
|
Post indicator valve location needs to be verified, fittings need to be coated 5/13/2002 10:44:17 AM
|