Permit Information
Permit NumberFIR02-00178
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 12639 W EXPLORER ST
Project NameSPR UG MORETON DEV SHELL
Customer Number 
ePlanReview 
Description
BOISE RESEARCH CENTER * MORETON DEVELOPMENT OFFICE - U.G. - TO INSTALL APPROXIMATELY 235 FT OF C-900 FROM THE PROPERTY LINE ON THE S.E. CORNER PROPERTY LINE, AROUND THE WEST (BACK) SIDE AND UNDER THE FOOTING OF A NEW 23,125 FT/2, TWO STORY OFFICE SHELL AND CORE BUILDING. THE RISER TO APPROXIMATELY 6" ABOVE FLOOR WILL BE DUCTILE IRON WITH A 11" FLANGE ADAPTER. THIS IS AN UNDERGROUND FIRE SERVICE SUPPLY PERMIT ONLY. NO OVERHEAD FIRE SPRINKLER WORK IS ALLOWED UNDER THIS PERMIT. SEPARATE FIRE PERMIT REQUIRED FOR THE SHELL & CORE PERMIT AND/OR TENANT IMPROVEMENTS. THE UNDERGROUND FIRE SPRINKLER SUPPLY SHALL COMPLY WITH NFPA 13-1999, NFPA 24-1995, AWWA, APPROVED PLANS, ATTACHED REVIEW COMMENT AND CONDITIONS LIST; AS REGULATED BY THE FIRE CHIEF. AN APPROVED AND STAMPED PLAN, PERMIT AND FIRE "INSPECTION CARD" IS REQUIRED ON SITE AS A CONDITION OF THIS PERMIT, TO PROVIDE WITNESS OF COMPLIANCE TO THE INSTALLATION AND MATERIALS. THIS PERMIT IS ATTACHED TO BLD01-02513.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/24/200210/24/200210/24/2002PPASS
DetailsTroy Cobbley
fire finaled
INSP-Sprinkler Rough-in/Hydro10/16/200210/17/200210/17/2002ACANC
DetailsTroy Cobbley
inspection was for the above ground hydro test and has been passed under FIR02-00304 10/17/2002 10:50:30 AM
INSP-Sprinkler Rough-in/Hydro10/16/200210/16/200210/16/2002PCANC
DetailsTroy Cobbley
inspection was for the overhead rough-in and the entry was made under FIR02-00304 10/16/2002 4:00:14 PM
INSP-Supply line flush8/29/20028/30/20028/30/2002APASS
DetailsTroy Cobbley
underground supply line flush and hydro test OK 8/30/2002 10:40:36 AM
INSP-Sprinkler Rough-in/Hydro5/15/20025/15/20025/15/2002APART
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/15/2002 8:23:29 AM underground only - okay to cover; PIV installed as shown on plans 5/15/2002 10:25:01 AM
INSP-Sprinkler Rough-in/Hydro5/10/20025/13/20025/13/2002AFAIL
DetailsTroy Cobbley
Post indicator valve location needs to be verified, fittings need to be coated 5/13/2002 10:44:17 AM