INSP-Final Inspection | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 7/29/2002 | 8/1/2002 | 8/1/2002 | A | FAIL |
Troy Cobbley
|
|
|
all items are ok except for fire alarm contractor needs to submitt fire alarm plans 8/1/2002 11:40:52 AM
|
INSP-Final Inspection | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | FAIL |
Troy Cobbley
|
|
|
there is still encapsulated items throughout the stockrooms, heads still need the 6" clearance, tamper switch needs to be tested 7/10/2002 2:36:24 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PASS |
Troy Cobbley
|
|
|
Hydro test for the in rack sprinkler system OK 6/27/2002 1:44:14 PM
|
INSP-Sprinkler Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 | A | FAIL |
Troy Cobbley
|
|
|
mattresses must be stored below 12', product cannot be encapsulated, replace solid shelving with open shelving, maintain flu space behind the racking, maintain 6" min. clearance between sprinkler head and the top of the product, provide EQ at top of the 4" drop downs to the rack sprinklers or provide verification of non requirement, move EQ attachments to the top of the truss instead of the bottom or provide verification per NFPA 13. 6/26/2002 10:41:13 AM
|