Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR02-00228
StatusFinaled
Name PROTEX
Site Address 715 S CAPITOL BLVD
Project Namealm-Boise City Library
Customer Number 
ePlanReview 
Description
Boise City Library - To install a new fire alarm system in this existing building. The system will include manual pull stations, sprinkler system and fire pump monitoring, smoke detection for air handler shutdown and smoke damper release, elevator recall, monitoring of a Halon extinguishing system, and a/v annunciation.
The associated building permit (BLD 01-03082) is to perform elevator, fire alarm, and security upgrades to the Boise City Public Library. Work is to include new storefront doors, new doorways in front elevator shaft #1 at the 2nd and 3rd floors, new smoke control doors on all doorways in front elevator shaft #1, upgrades to the elevator machine room, security upgrades to selected doors, and the modernization of two elevators.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/22/20035/22/20035/22/2003APASS
DetailsRick Jackson
INSP-Final Inspection5/20/20035/21/20035/21/2003AFAIL
DetailsRick Jackson
this is grants cell. If we can do this at 8.00AM. Thank you Terry; Phone #: ###-#### Internet Inspection Request from: Terry Owsley need maps of initiating devices and Record of Completion; strobes synch'd 5/21/2003 7:49:40 AM
INSP-Final Inspection5/9/20035/13/20035/13/2003AFAIL
DetailsRick Jackson
This is Grants cell. This needs to be done at 7:00 am. Have a great day.; Phone #: ###-#### Internet Inspection Request from: Terry Owsley not synchronized; maps with initiating devices; need better descriptors at FACP 5/13/2003 8:41:27 AM
INSP-Final Inspection5/5/20035/9/20035/8/2003ACANC
DetailsRick Jackson
This is Grants Cell. Needs to be tested at 7:00 am if thats OK
Have a great day.; Phone #: ###-#### Internet Inspection Request from: Terry Owsley called Rob of Protex and told him I would not be able to do this inspection on 5/09 and he said he would reschedule for next week 5/8/2003 1:10:59 PM
INSP-Final Inspection4/24/20034/28/20034/28/2003ANR
DetailsRick Jackson
This is grants Cell.
Thank you ; Phone #: ###-#### Internet Inspection Request from: Terry Owsley talked to Grant and they will reschedule when ready 4/28/2003 1:47:17 PM
INSP-Final Inspection4/22/20034/25/20034/24/2003ACANC
DetailsRick Jackson
This is Grants Cell
Thanks Terry; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Inspection cancelled from web by: Terry Owsley
INSP-Final Inspection2/21/20032/24/20032/24/2003ANR
DetailsRick Jackson
Grant Ahten; Phone #: ###-#### Internet Inspection Request from: Terry Owsley per phone call from Rob this inspection won't be ready as they have determined that sprinkler control valves aren't supervised by the alarm panel; he will call when ready 2/24/2003 1:23:52 PM
INSP-Final Inspection2/7/20032/12/20032/12/2003AFAIL
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Terry Owsley inspection stopped due to: horns not working on all floors; strobes not in sync; south area of first floor devices not being recognized. Also need device location maps at FACP. Will need to test all devices, notification circuits; troubles; elevator recall; pump supervision - start test from scratch 2/12/2003 8:52:48 AM
FIR-Aging Inspection1/28/20031/28/20031/28/2003 NR
DetailsTroy Cobbley
I spoke with Grant, who is with Protex and he stated that they were waiting for the elevators to get signed off before they called for inspection on the fire alarm system. He stated that the inspection would probably be called in next week 1/28/2003 9:40:20 AM