INSP-Final Inspection | 2/25/2003 | 2/28/2003 | 2/28/2003 | P | PASS |
Rick Jackson
|
|
|
3:00
|
INSP-Final Inspection | 2/21/2003 | 2/25/2003 | 2/25/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 2:47:18 PM. Contact: ###-####. rescheduled for 2/28 at 3 pm 2/25/2003 12:22:05 PM
|
INSP-Final Inspection | 2/6/2003 | 2/7/2003 | 2/7/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 11:50:07 AM. Contact: ###-####. tested duct detectors and all worked properly; need the following - new plans submitted for changes; map at remote annunciator with instructions; labels on rooftop cans indicating detectors inside cans; test panel for troubles etc; test sprinkler controls/flows; check NAC panels 2/7/2003 5:10:38 PM
|
INSP-Final Inspection | 1/23/2003 | 1/24/2003 | 1/24/2003 | P | FAIL |
Troy Cobbley
|
|
|
all spot smoke detectors and pull stations have been tested. The zone labeling for the smokes and the pull stations that are shown on the plans is incorrect and needs to be shown correctly on the as-built plans. No duct smoke detectors have been tested. One of the duct detectors in the south end of the building is installed correctly. All audio/visual devices were tested and functioned correctly. Smokes, pulls and A/V's are installed in the correct locations. No other devices have been tested including the NAC panels, FACP panel or fire sprinkler system devices. Review notes have not been looked at by me. 1/24/2003 3:57:34 PM
|
INSP-Conference | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PART |
Rick Jackson
|
|
|
PHIL ; Phone #: ###-#### Internet Inspection Request from: Annette Moore due to numerous changes proposed by Phil Omas that resubmittals are required 9/17/2002 2:43:10 PM
|