Permit Information
Permit NumberFIR02-00310
StatusFinaled
Name SIMPLEX/GRINNELL FIRE PROTECTION
Site Address 1404 W MAIN ST
Project NameSPR FIRST NATIONAL PAWN
Customer Number 
ePlanReview 
Description
(FIRST NATIONAL PAWN) To modify the riser and extend a fire sprinkler system into a remodeled 17,368 ft/2 one story building, (11,820 square foot main floor and 5,548 square foot basement). A 5,235 square foot retail sales room is being created on the main floor. The 5,548 square foot basement will retain its storage occupancy. Construction with appropriate fire protection includes interior nonbearing walls and suspended ceilings. The fire sprinkler system must be installed and operational prior to a Certificate of Occupancy being issued to this tenant. The basement of this building has and existing sprinkler system. This building requires full fire sprinklers throughout, to avoid the 1-hr occupancy separations at storage rooms. All fire sprinkler system work shall comply with NFPA 13?1999, attached review comment and conditions list; as regulated by the fire chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit BLD02-01818.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/30/200210/31/200210/31/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/30/2002 at 15:10:53. Contact: ###-####.
INSP-Final Inspection9/12/20029/13/20029/13/2002ACANC
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung not a final inspection see flush for this date 9/13/2002 1:40:39 PM
INSP-Supply line flush9/13/20029/13/20029/13/2002PPART
DetailsRick Jackson
flushed underground and hydro okay for underground; attempted to forward flow the backflow preventer - couldn't get the required gpm's with the equipment on hand
INSP-Sprinkler Rough-in9/12/20029/12/20029/12/2002PPART
DetailsRick Jackson
PIV installed and okay to cover
INSP-Sprinkler Rough-in/Hydro9/9/20029/10/20029/10/2002PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/09/2002 at 08:01:00. Contact: ###-####. heads overspaced at corridor wall in showroom; add head at main entrance; PIV not installed; FDC will rewuire sign to prevent parking blocking it; add 911 on outside bell; test alarms when installed; hydro okay 9/10/2002 3:57:43 PM