Permit Information
Permit NumberFIR02-00311
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1200 N CURTIS RD
Project NameSPR IDAHO STATESMAN
Customer Number 
ePlanReview 
Description
The Idaho Statesman * To add fire sprinkler protection in phases, within a new 6,700 ft/2 open office area addition on the ground floor and a 6,150 ft/2 pre-planned second floor addition. Permit includes the remodel of approximately 40,000 ft/2 of existing office space, new riser work, which includes backflow preventer, with forward flow test connection appurtenance. Fire sprinklers are used for the unlimited area. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-00311.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/2/200310/2/200310/2/2003PPASS
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs all items completed 10/2/2003 1:20:54 PM
INSP-Final Inspection8/18/20038/19/20038/19/2003AFAIL
DetailsTroy Cobbley
JIM; Phone #: ###-#### Various hangers on the 2 1/2" branchlines in the warehouse exceed exception #2 of NFPA 13 6-4.5.3 and therefore require E.Q. brace. Provide fourway bracing at all risers per NFPA 13 6-4.5.5. Provide forward flow flush. Walk thru entire project to verify follow up notes and canopies. Verify all review notes have been followed. Provide signage and stripping for FDC access per conversation 8/19/2003 1:31:36 PM
INSP-Sprinkler Rough-in/Hydro7/10/20037/10/20037/10/2003PPART
DetailsTroy Cobbley
conference room in the northwest corner of the building is ok to cover. One pendant is not installed per plan. The sprinkler fitter said he would correct it. Its location is marked on the plans and will be checked on the next inspection 7/10/2003 2:19:01 PM
INSP-Sprinkler Rough-in5/16/20035/16/20035/16/2003PPART
DetailsTroy Cobbley
jim; Phone #: ###-#### Rooms where the sprinkler piping can be covered are marked on the job site approved plans. Piping in kitchen area exceeds heads for 1 1/4" pipe size and electrical room needs fire sprinkler protection 5/16/2003 4:09:20 PM
INSP-Sprinkler Rough-in4/17/20034/17/20034/17/2003PPART
DetailsRick Jackson
ADAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs identified on plans for area okay to cover; will recheck for two retaining straps as marked on plans 4/17/2003 3:03:09 PM
INSP-Sprinkler Rough-in2/20/20032/20/20032/20/2003PPART
DetailsTroy Cobbley
adam; Phone #: ###-#### The main lobby area and corridor sprinkler piping is ok to cover. The area is shown on the approved sprinkler plan. 2/20/2003 3:25:17 PM
INSP-Sprinkler Rough-in/Hydro2/10/20032/10/20032/10/2003PPART
DetailsTroy Cobbley
###-#### jim The sprinkler piping in the plate room 222 on the second floor can be covered. One sprinkler head needs to be relocated and a hanger needs to be added. Locations are shown on the approved plans. The sprinkler pendants in the corridor outside of this room are overspaced and need corrected 2/10/2003 3:12:04 PM
INSP-Sprinkler Rough-in2/3/20032/3/20032/3/2003PPART
DetailsTroy Cobbley
###-#### The main lobby area sprinkler piping can be covered. The main sprinkler piping as it penatrates the block wall in two locations will need to be provided with adequate clearance. Hangers will need to be added at two locations on the existing main 2/3/2003 3:13:40 PM
INSP-Sprinkler Rough-in/Hydro12/17/200212/17/200212/17/2002PPART
DetailsTroy Cobbley
hydro test on the second floor is ok 12/17/2002 4:02:07 PM
INSP-Sprinkler Rough-in/Hydro11/27/200211/27/200211/27/2002PPART
DetailsTroy Cobbley
areas that are approved for cover have been marked on the approved job site plans with todays date 11-27-02 11/27/2002 3:02:59 PM
INSP-Sprinkler Rough-in/Hydro11/22/200211/22/200211/22/2002PPASS
DetailsTroy Cobbley
the specific areas that have roughin approved and are ok to cover have been marked on the job site approved sprinkler plans with todays date and signature 11-22-02 11/22/2002 4:35:27 PM
INSP-Sprinkler Rough-in/Hydro9/5/20029/5/20029/5/2002PPASS
DetailsTroy Cobbley
rough-in for sprinklers in the new addition is OK. I gave permission to cover pipe. Hydro test for the sprinkler piping in the new addition is OK 9/5/2002 2:53:04 PM
INSP-Sprinkler Rough-in/Hydro8/20/20028/21/20028/21/2002PPART
DetailsTroy Cobbley
sprinklers in telemarketing area is OK for cover except for retaining staps and eq bracing needing to be brought up to code 8/21/2002 2:07:32 PM