INSP-Final Inspection | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/14/2003 at 8:21:59 AM. Contact: ###-####.
|
INSP-Final Inspection | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/7/2003 at 11:01:34 AM. Contact: ###-####. will reschedule for 2/10/03 2/7/2003 3:53:59 PM
|
INSP-Sprinkler Rough-in | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PART |
Rick Jackson
|
|
|
###-#### okay to cover; riser not complete; sidewalls not installed in garage 10/4/2002 10:03:17 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | FAIL |
Rick Jackson
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need plans; hangers/straps/tenting not ready 10/3/2002 9:09:01 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | PART |
Troy Cobbley
|
|
|
First floor sprinklers are OK to cover. Second floor still needs cover inspection. Notified the contractor to double check the distance the sidewall sprinkler heads in the garage are from the ceiling and to provide insulation on vertical risers along garage wall 10/3/2002 2:00:56 PM
|