INSP-Final Inspection | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled 12/20/2002 2:44:18 PM
|
INSP-Final Inspection | 12/4/2002 | 12/4/2002 | 12/4/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide test to verify flow for hydraulic calcs., remove switch that shuts off power for the air compressor, provide lockout on aircompressor breaker, provide hydraulic placard 12/4/2002 2:00:28 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | PASS |
Troy Cobbley
|
|
|
hydro test is ok and the rough-in is ok 11/14/2002 3:55:11 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2002 | 11/13/2002 | 11/13/2002 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test for the dry system is ok. It lost just over a pound of pressure 11/13/2002 1:17:21 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PART |
Troy Cobbley
|
|
|
24 hour air test on the dry system. The gauge reads just under 42 lbs and the clock started at 1:00 pm
|