Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR02-00411
StatusExpired
Name BOISE CITY AIRPORT
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-NEW TERMINAL
Customer Number 
ePlanReview 
Description
6/8/2004 - Plan Modifications - Scope revised to add dry sprinkler system on concourse B, adding NAC #16 (comm. room 2199-C) with new appliances to second floor, and demolition of building and temporary walkway.

The original fire alarm permit (FIR01-00523) and drawings have been voided and superceded by FIR02-00411, which includes new drawings. Fire alarm drawings were resubmitted due to initiating and notification device relocation/additions. The areas where the changes have been made are clouded on these drawings. Comments from the previous permit reviews are included in this review. The scope of work is to extend the existing fire alarm system to include the new addition areas. Coverage will include a manual fire alarm system, sprinkler flow, valve tamper and fire pump monitoring, elevator recall, in-duct detectors for fire/smoke dampers, duct detectors for HVAC air handler shut down, full visual annunciation with a voice evacuation system, limited area smoke detectors in mechanical equipment rooms, all connecting to two existing networked fire alarm panels with two new 4120 transponders and monitored offsite by remote station service.


The building permit (BLD 01-03428) is to: CONSTRUCT A NEW 311,820 SQ. FT., THREE STORY WITH 45,000 SQ. FT. BASEMENT AIRPORT PASSENGER TERMINAL BUILDING AND RELATED SITE IMPROVEMENTS. THIS TERMINAL BUILDING IS BEING CONSTRUCTED TO REPLACE THE EXISTING TERMINAL BUILDING. THE PROJECT WILL BE CONSTRUCTED IN PHASES. SCHEDULE I WILL BE CONSTRUCTED OUTSIDE OF THE EXISTING TERMINAL FOOTPRINT AND WILL INCLUDE THE BASEMENT SUPPORT AREAS, FIRST FLOOR BAGGAGE CLAIM/MAKE UP, SECOND FLOOR TICKETING, ATO AND LEASE AREAS AND THE THIRD FLOOR ADMINISTRATIVE AND LEASE AREAS. SCHEDULE II WILL INCLUDE DEMOLITION OF THE WEST END OF THE EXISTING TERMINAL BUILDING AND THE CONSTRUCTION OF THE FIRST FLOOR RENTAL CAR LOBBY AND GROUND LOAD LOBBY AND SECOND FLOOR SECURITY CHECKPOINT, FOOD COURT AREAS AND PASSENGER LINK TO EXISTING CONCOURSE 'B'. SCHEDULE I ALSO INCLUDES CONSTRUCTION OF TEMPORARY ELEVATED WALKWAYS AND SECURITY CHECKPOINTS CONSTRUCTED OVER THE EXISTING TERMINAL BUILDING, TO CONNECT THE COMPLETED AND OPERATING SCHEDULE I BUILDING WITH THE EXISTING CONCOURSES. AFTER COMPLETION OF SCHEDULE II, THE REMAINDER OF THE EXISTING TERMINAL BUILDING, THE TEMPORARY ELEVATED WALKWAYS AND CONCOURSE 'A' WILL BE DEMOLISHED AND REMOVED.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/8/200411/8/200411/8/2004PPASS
DetailsRick Jackson
INSP-Final Inspection10/5/200410/7/200410/7/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/5/2004 at 3:19:20 PM. Contact: ###-####. Completed all phases of this permit; need to verify with Mary if any other submittals are needed to plan review 10/8/2004 7:58:32 AM
INSP-Final Inspection9/16/20049/17/20049/17/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/16/2004 at 3:05:12 PM. Contact: ###-####. Area D with TI's okay; still need Area E and temp walkway modified for permanent storage/office use 9/17/2004 11:41:41 AM
INSP-Final Inspection9/7/20049/10/20049/10/2004ACANC
DetailsRick Jackson
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Call when ready for changes that are needed for final 9/10/2004 11:59:16 AM
INSP-Final Inspection9/7/20049/9/20049/9/2004AFAIL
DetailsRick Jackson
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need additional pull at exit door to stair C in area E; need speaker/strobe in Horizon Ops and mechanical for AHU 5; as-builts needed at final to plan review; record of completion needed at final 9/9/2004 11:52:06 AM
INSP-Final Inspection9/7/20049/8/20049/8/2004AFAIL
DetailsRick Jackson
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Change descriptors (see point list/plans); Horizon Air ops area needs notification (2nd floor); will need additional time to complete testing/acceptance 9/8/2004 12:00:50 PM
INSP-Alarm Testing9/3/20049/3/20049/3/2004APART
DetailsRick Jackson
tested Area C at car rental expansion - okay; all horn/strobes operated in Phase 2 on all floors 9/3/2004 9:10:09 AM
INSP-Conference2/3/20042/4/20042/4/2004APASS
DetailsRick Jackson
Met with Al and reviewed custom lables with locations/room numbers - this portion of Phase I is completed and closes out any open inspection items 2/4/2004 3:03:30 PM
INSP-Conference12/30/200212/30/200212/30/2002APART
DetailsRick Jackson
met with Steve of LEA Electirc; c/n issued - need detectors installed within 5 ft of smoke/fire dampers; need access doors at all dampers; will need to verify duct detector operation with air differential pressure test per Simplex manual instructions; duct detectors are installed at some smoke/fire dampers - plans show in-duct detectors; numerous pockets in computer room ceiling which will require detectors for pre-action system 12/30/2002 11:00:43 AM