Permit Information
Permit NumberFIR02-00423
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 9950 W USTICK RD
Project NameSPR NEW HEIGHTS CHRISTIAN
Customer Number 
ePlanReview 
Description
(NEW HEIGHTS CHRISTIAN FELLOWSHIP ADDITION) To install a complete, new, wet system with an extended dry system protecting a porte-cochere, in a 17,367 ft/2 one story, Type V1hr sanctuary with classrooms, office, kitchen and narthex addition to an existing fire sprinklered building. Also included in this permit is the installation of approximately 170'-0" of 6" C-900, PVC supply main west of the structure, starting at the property line off Jullion St., running east, and into the new facilities outside accessible Riser room, #112. The new addition must be fully fire sprinklered for substitution of the one-hour construction. All fire sprinkler system installation work and equipment, materials and appurtenance shall comply with NFPA 13?1999, 24-1995, 72-1999, and attached review comment and conditions list; as regulated by the Fire Chief. These notes, permit and fire Inspection Card are required to be on site as a condition of this work, to provide witness of compliance verification meeting minimum code. This permit is attached to building permit: BLD02-00155.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/12/20035/12/20035/12/2003PPASS
DetailsTroy Cobbley
INSP-Sprinkler Rough-in/Hydro5/8/20035/9/20035/9/2003AFAIL
DetailsTroy Cobbley
Can not complete the fire sprinkler inspection until the fire alarm system is ready. The fire sprinkler connections to the fire alarm system are the only items left to complete, dry pipe riser and wet riser. 5/9/2003 11:29:27 AM
INSP-Final Inspection5/7/20035/8/20035/8/2003AFAIL
DetailsTroy Cobbley
Too many items wrong to list. see correction notice 5/8/2003 3:06:59 PM
INSP-Sprinkler Rough-in/Hydro5/7/20035/7/20035/7/2003PPART
DetailsTroy Cobbley
Started the 24 hour test on the dry system at 1:30. Guage is at 45 psi
INSP-Sprinkler Rough-in/Hydro4/8/20034/8/20034/8/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/8/2003 at 8:13:02 AM. r/i of sanctuary - head has baggie and one head painted - see plans for exact locations 4/8/2003 4:02:39 PM
INSP-Sprinkler Rough-in/Hydro4/7/20034/7/20034/7/2003PPART
DetailsTroy Cobbley
See on site approved plans for locations to add upright heads and eq bracing. Other areas still need rough-in inspection 4/7/2003 12:15:41 PM
INSP-Sprinkler Rough-in/Hydro3/12/20033/13/20033/13/2003APART
DetailsTroy Cobbley
sprinkler piping is ok to cover in rooms marked on the job site approved plans. Upright sprinkler heads to be added above the mens restroom 3/13/2003 1:36:49 PM
INSP-Sprinkler Rough-in/Hydro2/11/20032/12/20032/12/2003APART
DetailsTroy Cobbley
Front canopy piping is OK to cover 2/12/2003 8:46:59 AM