Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR02-00436
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 873 E CITATION CT
Project NameSPR Bon Aire Industries
Customer Number 
ePlanReview 
Description
Bon Aire Industries * To install fire sprinkler protection in a new 26,050 ft/2, one story with mezzanine, warehouse and accessory office building, constructed of concrete tilt-up exterior walls and steel structural frame and roof joists. The mezzanine is 2800 ft/2. This permit also includes the underground fire service supply. The fire sprinklers are required for area increase. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-01912.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/19/20035/19/20035/19/2003PPASS
DetailsRick Jackson
INSP-Sprinkler Rough-in/Hydro3/26/20033/26/20033/26/2003PPART
DetailsRick Jackson
ADAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs hydro okay on overhead and underground 3/26/2003 4:00:53 PM
INSP-Supply line flush3/17/20033/19/20033/19/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/17/2003 at 2:16:03 PM. Contact: ###-####. flush okay; sprinkler heads painted in office area 3/19/2003 10:11:33 AM
INSP-Conference1/23/20031/24/20031/23/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/23/2003 at 13:01:06. Contact: ###-####. completed UG cover on 1/23 1/23/2003 2:47:55 PM
INSP-Sprinkler Rough-in1/23/20031/23/20031/23/2003PPART
DetailsRick Jackson
underground complete; okay to cover
INSP-Conference12/19/200212/19/200212/19/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/19/2002 at 09:19:07. Contact: ###-####. conference about UG 12/19/2002 3:49:35 PM
INSP-Sprinkler Rough-in12/19/200212/19/200212/19/2002PPART
DetailsRick Jackson
UG r/i okay; stub out from building