Permit Number | FIR02-00439 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE PROTECTION
|
Site Address |
150 N CAPITOL BLVD
|
Project Name | SPR CITY HALL EXP-1ST FLR |
Customer Number | |
ePlanReview | |
Description |
(BOISE CITY ADMINISTRATIVE OFFICES)(CITY HALL EXPANSION-1st FLOOR) (ARTS COMMISSION, DFM & UTILITY BILLING) To perform selective fire sprinkler demolition of entire 1st floor and maintain fire sprinkler protection throughout during construction. To modify, add, relocate the existing fire sprinkler system for the remodel of 11,975-ft/2, floor area for use as offices and support areas. Sprinkler work is related to interior, non-bearing, fire-resistive walls to create offices, work rooms, conference rooms, training room & break room and new suspended grid ceiling system. NOTE: This building is fully sprinklered. The fire sprinkler system work shall comply with NFPA 13?1999, attached review comment and conditions list; regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of meeting minimum code conditions. This permit is attached to building permit: BLD02-01413.
|