Description |
SARMC S. TOWER, 5TH FL. PATIENT CARE UNIT - To add complete automatic and manual fire alarm coverage in the 5th floor remodel area, connected to the existing networked facility fire alarm system. Coverage shown on plans includes, but is not limited to, manual pull stations, area smoke detection, elevator recall, release of door hold-opens, smoke detectors for HVAC air handler shutdown and release of smoke dampers, and a/v annunciation.
The associated building permit (BLD 02-00728) is to perform selective demolition per plan and to remodel the west 18,295 sq. ft. portion of the existing 34,940 sq.ft on the 5th floor for Patient Care Rooms and support facilities per approved plans, to include red-line notes on plans & attached plan review comments & conditions of all reviewing agencies as part of the approved plans on file. Work includes construction of interior non-bearing, non-combustible, fire-resistive walls to create a 1-hour exit corridor system; rooms for patients, isolation & treatment, equipment & supply storage, accessible restrooms and staff facilities; suspended ceiling grid system; electrical, mechanical, plumbing, fire suppression & alarm system upgrades to meet tenant needs and comply with current adopted codes & ordinances.
|