INSP-Final Inspection | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | FAIL |
Rick Jackson
|
|
|
Would like to do final walk through on fire sprinklers and do flow test for fire pump. We would like to schedule the inspection at about 1:00 pm; Phone #: ###-#### Internet Inspection Request from: Trent Bice tested pump for flow at 150% and there is 25 psi on supply; will need pump certification papers; spare heads; sign on pump room door; no floor drain; 11/17/2003 4:59:26 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/5/2003 | 11/6/2003 | 11/5/2003 | P | CANC |
Rick Jackson
|
|
|
Please call 1 hour prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2003 | 8/15/2003 | 8/15/2003 | P | PART |
Rick Jackson
|
|
|
Call prior to arrival so that we can have system charged. Foremans name is Rudi.; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on perimeter racking okay 8/15/2003 3:41:20 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PART |
Rick Jackson
|
|
|
third floor mezz okay; hose valves not completed for this level 7/29/2003 9:33:35 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PART |
Rick Jackson
|
|
|
Please call 1 hour before inspection so we can set at 200lbs. Thank you ; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on 3rd floor mezz okay; will continue rough in tomorrow 7/28/2003 3:32:26 PM
|
FIR-Aging Inspection | 7/9/2003 | 7/9/2003 | 7/9/2003 | | PASS |
Rick Jackson
|
|
|
talked to Trent and he said the work is in progress and they are 3 weeks out 7/10/2003 9:56:53 AM
|