INSP-Final Inspection | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 8:00:13 PM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 9:48:47 AM. Contact: ###-####. UG and FDC hydro okay 3/27/2003 12:40:46 PM
|
INSP-Supply line flush | 3/25/2003 | 3/26/2003 | 3/26/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/25/2003 at 6:15:37 PM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 11:54:49 AM. Contact: ###-####. underground okay to cover; will need hydro on UG and FDC; flush required also; okay to cover overhead 2/25/2003 10:56:59 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | FAIL |
Rick Jackson
|
|
|
tried hydro - one head has small leak at main entrance - will rehydro 2/25/2003 3:41:26 PM
|