INSP-Final Inspection | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PASS |
Troy Cobbley
|
|
|
ralp; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
INSP-Final Inspection | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PASS |
Troy Cobbley
|
|
|
ralp; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
INSP-Final Inspection | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | FAIL |
Troy Cobbley
|
|
|
Hvac units did not shut down upon alarm, provide the NFPA 72 record of completion forms 9/2/2003 10:36:28 AM
|
INSP-Final Inspection | 8/29/2003 | 8/29/2003 | 8/29/2003 | P | FAIL |
Troy Cobbley
|
|
|
Repair strobe near room 201, need to comply with notes 12 and 14, switch text for north and south pulls, test all devices in the south wing, verify all review notes have been complied with, need fax of reports
|
INSP-Final Inspection | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | FAIL |
Troy Cobbley
|
|
|
ralph; Phone #: ###-#### Hood system, inside tamper vavles and the wet flow switch worked correctly. Other items such as the low air and the PIV did not. The alarm tech. did not know how to test the batteries on the panel and the D8132 module say 15ah max battery but the cut sheet states 18ah. Tech support never did answer their line for us to get answers 8/27/2003 2:13:44 PM
|
FIR-Aging Inspection | 7/7/2003 | 7/7/2003 | 7/7/2003 | | FAIL |
Troy Cobbley
|
|
|
work in progress 7/7/2003 8:52:28 AM
|