INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 1:55:32 PM. Contact: ###-####. hydro okay 9/24/2003 12:22:48 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2003 | 9/23/2003 | 9/23/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 2:25:13 PM. Contact: ###-####. hydro okay on systems one and two 9/23/2003 1:09:00 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 11:50:58 AM. Contact: ###-####. installed per resubmittals 7/31/2003 3:10:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/29/2003 at 9:59:04 AM. Contact: ###-####. rescheduled for 7/31 7/30/2003 11:35:03 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/7/2003 | 7/8/2003 | 7/8/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 2:36:20 PM. Contact: ###-####. resubmittals needed for pipe changes and relocation of inspectors tests; may put systems over 750 gallons; Scheduled by a contractor via Hello! on 7/7/2003 at 2:34:48 PM. Contact: ###-####. need resubmittals for pipe changes and standpipe changes; need listing for fire stopping standpipe through floor/ceiling assembly; EQ needed; need heat to maintain 40 degrees in north rooms where main enters building through vestibule and bike room 7/8/2003 4:25:20 PM
|
FIR-Aging Inspection | 6/16/2003 | 6/16/2003 | 6/16/2003 | | PART |
Rick Jackson
|
|
|
work is still in progress 6/16/2003 9:48:08 AM
|