Permit Information
Permit NumberFIR03-00068
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 190 E FRONT ST
Project NameSPR COURTHOUSE-PA3 APARTMENTS
Customer Number 
ePlanReview 
Description
(CIVIC PLAZA PA3-APARTMENTS) To fire sprinkler a new 152 unit, 4-levels of R-1 apartments on top an existing three story Type S-3 parking garage constructed under BLD00-03538 and fire sprinklered under FIR01-00504. To modify and add fire sprinklers in the single at-grade existing shell level for new leasing office, community center, fitness room, a laundry room, storage rooms and a trash room. Basement modifications include the additions of an electrical room, storage rooms and the installation of added elevator cars in existing shafts. All fire sprinkler work shall be in accordance with NFPA 13-1999, complying with the UFC-1997 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to garage shell permit: BLD02-00090.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/31/200312/31/200312/31/2003APASS
DetailsRick Jackson
INSP-Final Inspection10/1/200310/2/200310/2/2003APART
DetailsRick Jackson
as per requestd, to test peration of pressure relief valve.; Phone #: ###-#### Internet Inspection Request from: Trent Bice 10/2/2003 9:12:44 AM pressure-reducing valve is installed; need submittals to plan review and approval prior to final sign-off 10/2/2003 2:54:29 PM
INSP-Sprinkler Rough-in/Hydro9/29/20039/30/20039/30/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/29/2003 at 2:08:05 PM. Contact: ###-####. QR heads installed in all areas; still have tape on heads in stairs; system over 175 psi and a pressure reducing valve is supposed to be coming; bell still not attached to wall; fire pump room requires firestopping at floor joint; will need all certification paperwork at final 9/30/2003 4:15:42 PM
INSP-Alarm Testing9/29/20039/29/20039/29/2003AFAIL
DetailsRick Jackson
tested all exsisting and new tampers and flows - okay; still need to verify phase reversal; system pressure over 175 psi
INSP-Alarm Testing9/23/20039/25/20039/25/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/23/2003 at 1:58:24 PM. Contact: ###-####. tested fire pump with pump rep and Shilo - tested per NFPA 20 9/25/2003 4:10:25 PM
INSP-Sprinkler Rough-in/Hydro9/23/20039/24/20039/24/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/23/2003 at 1:54:20 PM. Contact: ###-####. hydro okay on new standpipe 9/24/2003 12:22:41 PM
INSP-Sprinkler Rough-in/Hydro9/22/20039/23/20039/23/2003ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/22/2003 at 2:23:57 PM. Contact: ###-####. hydro on standpipe not ready 9/23/2003 1:10:47 PM
INSP-Sprinkler Rough-in/Hydro9/11/20039/12/20039/12/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/11/2003 at 1:08:43 PM. Contact: ###-####. hydro okay on overhead 9/12/2003 10:50:57 AM
INSP-Sprinkler Rough-in/Hydro6/27/20037/2/20037/2/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/27/2003 at 10:47:03 AM. Contact: ###-####. first floor east end tenant okay to cover; will have 200 degree heads in laundry room by 7/3 7/2/2003 10:17:35 AM
INSP-Sprinkler Rough-in/Hydro6/27/20036/30/20036/30/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/27/2003 at 10:45:49 AM. Contact: ###-####. 4th floor (west side) r/i okay; heads not complete 6/30/2003 9:49:30 AM
INSP-Sprinkler Rough-in/Hydro6/9/20036/11/20036/11/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/9/2003 at 8:25:40 AM. Contact: ###-####. EQ's not attached to beams and attached to interior walls 6/11/2003 12:30:09 PM
INSP-Sprinkler Rough-in/Hydro6/11/20036/11/20036/11/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/11/2003 at 11:29:08 AM. Contact: ###-####. 4th floor area B okay; main riser and standpipe in east stairwell is located in path of door and will have to relocated 6/11/2003 4:01:37 PM
INSP-Sprinkler Rough-in/Hydro5/27/20035/30/20035/30/2003APASS
DetailsTroy Cobbley
I gave approval to cover area "A" on the 1st, 2nd and the 3rd floors. The south side 3rd floor 1" and 1 1/4" piping is not tied into the area "B" piping yet. Grooved cplgs at the expansion joints. Walls are not up yet on the third floor but hangers and eq bracing looked ok 5/30/2003 12:44:50 PM
INSP-Sprinkler Rough-in5/5/20035/6/20035/6/2003APART
DetailsRick Jackson
###-#### okay on first floor area A; will need tor echeck area at north stair as this wasn't finished 5/6/2003 4:14:37 PM
INSP-Sprinkler Rough-in/Hydro5/2/20035/5/20035/5/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/2/2003 at 1:28:18 PM. Contact: ###-####. escheduled for 5/6; left message with Mike's voicemail that I would be out on 5/6 5/5/2003 4:56:58 PM
INSP-Sprinkler Rough-in/Hydro4/24/20034/25/20034/25/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/24/2003 at 8:39:42 AM. Contact: ###-####. okay to cover 2nd and 3rd floor in area B only 4/25/2003 9:23:46 AM
INSP-Sprinkler Rough-in/Hydro4/21/20034/22/20034/22/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/21/2003 at 11:31:44 AM. Contact: ###-####. need hangers on third floor; encroaching into fire proofing on second; Mike is going to check with GC about it 4/22/2003 4:19:26 PM
INSP-Sprinkler Rough-in4/8/20034/11/20034/11/2003AFAIL
DetailsRick Jackson
MIKE ###-#### need additional EQ in three areas; see plans for exact locations 4/11/2003 9:51:36 AM
INSP-Sprinkler Rough-in4/11/20034/11/20034/11/2003PPART
DetailsRick Jackson
area B on first floor okay to cover 4/11/2003 3:43:37 PM