Permit Information
Permit NumberFIR03-00093
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 420 W MAIN ST
Project NameSPR VELTEX BUILDING-SHELL
Customer Number 
ePlanReview 
Description
VELTEX BUILDING LLC * To install a complete fire sprinkler system throughout this facility and a construct a new five-story, with a basement parking garage, 53,265 sq.ft. Type II 1-Hour, shell and core for mixed-use building. Stand pipes and the installation of a NFPA 13 fire sprinkler system is used for story increase. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-02126.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/9/20041/9/20041/9/2004PPASS
DetailsRick Jackson
FDC hydro okay; received all test certificates 1/9/2004 1:14:47 PM
INSP-Final Inspection1/8/20041/8/20041/8/2004AFAIL
DetailsRick Jackson
need heaqds replaced that are painted in basement and tape remove from others; hydro FDC; need signage on drains and blue tag on risers; SR head in elevator room; will need test papers at final;resubmittals for basement and fourth floor 1/8/2004 11:11:09 AM
INSP-Sprinkler Rough-in/Hydro1/8/20041/8/20041/8/2004PFAIL
DetailsRick Jackson
FDC hydro failed to hold pressure 1/8/2004 3:41:06 PM
INSP-Sprinkler Rough-in/Hydro1/6/20041/7/20041/7/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 1/6/2004 at 3:29:17 PM. Contact: ###-####. hydro on floors okay; small leak at Vic on 6 inch right near the check valve 1/7/2004 1:16:22 PM
INSP-Sprinkler Rough-in/Hydro12/22/200312/23/200312/23/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/22/2003 at 3:39:43 PM. UG hydro and flush okay; still need resubmittals for changes to 4-5 floor residence; dry inspectors test relocated; basement branch line relocated due to heaters and 286 heads used if within 7 ft of heater 12/23/2003 3:59:36 PM
INSP-Sprinkler Rough-in/Hydro12/2/200312/4/200312/4/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/2/2003 at 2:40:52 PM. Contact: ###-####. fourth floor - 1 head on 1inch line in stair as plans show 1.25 inch line; minor modifications around ducts, etc. 12/4/2003 4:04:01 PM
INSP-Conference11/10/200311/12/200311/12/2003APART
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes met with GC and Dave Hannah about shell sign-off and third floor occupancy 11/12/2003 2:51:32 PM
INSP-Sprinkler Rough-in/Hydro10/27/200310/28/200310/28/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/27/2003 at 1:25:30 PM. r/i for 1-2-3 floors; TI work in progress on 3rd 10/28/2003 11:00:57 AM
INSP-Sprinkler Rough-in9/18/20039/22/20039/22/2003AFAIL
DetailsRick Jackson
###-#### chris basement: need hangers at end of pipe and fix busted hangers; standpipe hose outlets to be 3-5 ft from floor; beams creating obstructions; 6 inch main shifted to the north next to 3 inch due to beams; additional EQ on riser 9/22/2003 3:57:26 PM
INSP-Supply line flush5/13/20035/13/20035/13/2003PPASS
DetailsTroy Cobbley
The inspection was not for a flush but for a cover of the underground. Piping is ok for cover 5/13/2003 3:03:53 PM