INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
INSP-Final Inspection | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | FAIL |
Rick Jackson
|
|
|
1 of 6 please Call Mike prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice need all trim completed 2/20/2004 4:24:52 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/10/2004 | 2/11/2004 | 2/11/2004 | A | PART |
Rick Jackson
|
|
|
hydro okay 2/11/2004 11:38:09 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 | A | FAIL |
Rick Jackson
|
|
|
Scott Carter. 1 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:55:09 PM 2/10/2004 3:56:31 PM
|
INSP-Conference | 1/28/2004 | 1/29/2004 | 1/29/2004 | A | PART |
Rick Jackson
|
|
|
The General Contractor would like to have this conference meeting @10:00AM. Please call if I need to set an inspection up on all other PA2 permits; Phone #: ###-#### Internet Inspection Request from: Trent Bice meeting with GC about final requirements for sign-off; requested Scott schedule me out when the pump is certified 1/29/2004 12:12:07 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 1:40:44 PM. Contact: ###-####. hydro on standpipe okay 10/28/2003 1:00:09 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2003 | 10/17/2003 | 10/17/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/16/2003 at 4:03:46 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor 10/17/2003 10:20:32 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/15/2003 | 10/16/2003 | 10/16/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 12:55:42 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 10/15/2003 at 12:54:45 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 10/15/2003 at 12:53:42 PM. Contact: ###-#### straps needed 628/609/room for construction elevator; elevator machine room requires SR heads - not QR 10/16/2003 4:03:14 PM 10/16/2003 4:04:12 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/14/2003 | 10/15/2003 | 10/15/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 11:36:42 AM. Contact: ###-####. room 512 needs strap in closet 10/15/2003 11:10:51 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/10/2003 at 8:35:43 AM. Contact: ###-####. okay to cover rooms; corridor requires firestopping; standpipes over 48 inches high 9/11/2003 12:33:58 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2003 | 9/4/2003 | 9/4/2003 | A | PART |
Rick Jackson
|
|
|
okay to cover rooms; corridor pipe not restrained to prevent upward movement; fire stopping required in corridor 9/4/2003 8:57:56 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2003 | 9/3/2003 | 9/3/2003 | P | CANC |
Rick Jackson
|
|
|
follow up from yesterday.; Phone #: ###-#### Internet Inspection Request from: Trent Bice per Mark this will be rescheduled for 9/4 9/3/2003 4:01:42 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:36:25 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:31:17 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:38:55 PM
|
INSP-Sprinkler Rough-in | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | PART |
Rick Jackson
|
|
|
pipe in corridors has excessive upward movement - need to restrain; rooms okay to cover on second floor only 8/28/2003 11:04:25 AM 8/28/2003 11:05:51 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/26/2003 | 8/27/2003 | 8/27/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/26/2003 at 10:25:11 AM. Contact: ###-####.
|
FIR-Aging Inspection | 6/25/2003 | 6/25/2003 | 6/25/2003 | | PART |
Rick Jackson
|
|
|
this project is still under constrcution 6/25/2003 7:30:45 AM
|