Permit Information
Permit NumberFIR03-00117
StatusFinaled
Name PEAK ALARM
Site Address 3361 N COLE RD
Project Namealm-COLE VILLAGE
Customer Number 
ePlanReview 
Description
FITNESS 19 /COLE VILLAGE SHOPPING CENTER - To install a new fire alarm system for this building, necessary to accommodate the fire alarm monitoring requirements associated with the TI project. The new system will provide monitoring of the fire sprinkler system and of HVAC duct smoke detectors being installed within the TI space for air handler shut down.
The associated building permit (BLD 02-02761) is to remodel to a 7,932 sq.ft. space and changing occupancy from retail to an assembly fitness studio per approved plans on file. Work to include miscellaneous interior demolition work, one-hour rated tenant demising wall infill, exterior wall infill, new interior walls, new interior doors and windows, relocating entrance doors, interior finish, new accessible restrooms, new suspended ceiling, fire sprinkler work, plumbing work, mechanical work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0716-02) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/15/20038/15/20038/15/2003PPASS
DetailsTroy Cobbley
fire alarm system finaled 8/15/2003 3:23:37 PM
INSP-Conference8/6/20038/6/20038/6/2003PDONE
DetailsTroy Cobbley
Peak Alarm requested another copy of the last correction notice. I redid it and delivered it to their office.
INSP-Final Inspection7/30/20037/31/20037/31/2003PFAIL
DetailsTroy Cobbley
There was no test orfice in the anti-freeze system piping of the post office so test could not be completed. The fire alarm system and the water motor gong in Handcock Fabrics did not operate 7/31/2003 4:00:26 PM
INSP-Final Inspection6/26/20036/30/20036/30/2003PFAIL
DetailsTroy Cobbley
The inspectors test orfices in Hancocks Fabrics and the Post Office still do not have the correct orfice installed in the inspectors test lines. Still need test papers 6/30/2003 3:43:07 PM
INSP-Final Inspection6/25/20036/26/20036/26/2003PCANC
DetailsTroy Cobbley
property manager did not show up to provide access 6/26/2003 3:44:24 PM
INSP-Final Inspection6/24/20036/25/20036/25/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/24/2003 at 4:55:43 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 25 2003 9:14AM.
INSP-Final Inspection6/2/20036/3/20036/3/2003AFAIL
DetailsTroy Cobbley
Test the flow switches in the post office, fitness19 and Hancock fabrics. The inspectors tests do not have the correct orfices. Provide approved submittals for the new power supply and test. Provide sign per note #13 6/3/2003 11:26:56 AM
INSP-Final Inspection6/2/20036/2/20036/2/2003PFAIL
DetailsTroy Cobbley
Inspection not complete. To be continued tomorrow. Incorrect items marked on approved plans. 6/2/2003 2:51:59 PM