INSP-Final Inspection | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | PASS |
Troy Cobbley
|
|
|
fire alarm system finaled 8/15/2003 3:23:37 PM
|
INSP-Conference | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | DONE |
Troy Cobbley
|
|
|
Peak Alarm requested another copy of the last correction notice. I redid it and delivered it to their office.
|
INSP-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 | P | FAIL |
Troy Cobbley
|
|
|
There was no test orfice in the anti-freeze system piping of the post office so test could not be completed. The fire alarm system and the water motor gong in Handcock Fabrics did not operate 7/31/2003 4:00:26 PM
|
INSP-Final Inspection | 6/26/2003 | 6/30/2003 | 6/30/2003 | P | FAIL |
Troy Cobbley
|
|
|
The inspectors test orfices in Hancocks Fabrics and the Post Office still do not have the correct orfice installed in the inspectors test lines. Still need test papers 6/30/2003 3:43:07 PM
|
INSP-Final Inspection | 6/25/2003 | 6/26/2003 | 6/26/2003 | P | CANC |
Troy Cobbley
|
|
|
property manager did not show up to provide access 6/26/2003 3:44:24 PM
|
INSP-Final Inspection | 6/24/2003 | 6/25/2003 | 6/25/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 4:55:43 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 25 2003 9:14AM.
|
INSP-Final Inspection | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | FAIL |
Troy Cobbley
|
|
|
Test the flow switches in the post office, fitness19 and Hancock fabrics. The inspectors tests do not have the correct orfices. Provide approved submittals for the new power supply and test. Provide sign per note #13 6/3/2003 11:26:56 AM
|
INSP-Final Inspection | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | FAIL |
Troy Cobbley
|
|
|
Inspection not complete. To be continued tomorrow. Incorrect items marked on approved plans. 6/2/2003 2:51:59 PM
|