INSP-Final Inspection | 9/28/2005 | 9/28/2005 | 9/28/2005 | A | PASS |
Forrest France
|
|
|
Additional pump flow test performed with Jim Danes of DeBest fire, 100% and 150% rated flow verified with residual pressure at 100% satisfactory.
|
INSP-Final Inspection | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | FAIL |
Rick Jackson
|
|
|
Fire Pump Final - Contact Brian - would like to have scheduled at 9 am; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Pump test at 150 percent resulted in negative pressure on suction side of pump; Sam Rogers recorded all pump test data 11/16/2004 10:24:33 AM
|
INSP-Final Inspection | 8/19/2003 | 8/21/2003 | 8/20/2003 | A | FAIL |
Rick Jackson
|
|
|
jim--fn with a fire pump; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need fire pump data and jockey/fire pump controller test lines to drain; fire pump couldn't pump to 150 percent capacity as the suction was at zero. 8/21/2003 7:25:53 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/7/2003 | 7/7/2003 | 7/7/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 10:45:26 AM. Contact: ###-####. wet and antifreeze systems will require annual inspection; heads overspaced above ceiling in kitchen per plan review notes; mezzanine area not fully sprinklered; head obstructed by partition in mens room; remove paper from heads throughout; sprinklers or noncumbustible area by dishwasher along wall; repair head in storage room; submit data for fire pump to plan review 7/7/2003 3:38:26 PM
|