Permit Information
Permit NumberFIR03-00133
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 4477 W WILLOW LN
Project NameSPR WOMENS & CHILDREN ALLIANCE
Customer Number 
ePlanReview 
Description
Women's and Children's Alliance * To install a new fire sprinkler system in a, 11,000-ft/2, type (a)VB, I1 and I4 occupancy structure. The structure is also getting some remodel, which includes the kitchen, and some bedrooms. This permit includes the underground, starting at the property line in N. Willow Lane, traveling east and north, approximately 292'-0" of 6" C-900 PVC, into a mechanical room. The fire sprinkler system work shall be installed in accordance to NFPA 13-1999, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-00334.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/19/20039/19/20039/19/2003PPASS
DetailsTroy Cobbley
INSP-Sprinkler Rough-in/Hydro9/8/20039/9/20039/9/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/8/2003 at 2:56:05 PM. Contact: ###-####. hydro on overhead okay 9/9/2003 11:13:33 AM
INSP-Supply line flush9/5/20039/8/20039/8/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/5/2003 at 1:24:30 PM. Contact: ###-####. UG hydro okay; will give ther UG certificate to Troy 9/8/2003 11:08:56 AM
INSP-Sprinkler Rough-in9/4/20039/4/20039/4/2003PFAIL
DetailsTroy Cobbley
see approved plans for deficiancy locations 9/4/2003 3:39:12 PM
INSP-Supply line flush7/21/20037/22/20037/22/2003APASS
DetailsTroy Cobbley
supply line flush ok 7/22/2003 8:17:31 AM
INSP-Supply line flush7/18/20037/21/20037/21/2003AFAIL
DetailsTroy Cobbley
Inspection was for rough-in on north wing. See approved plans for areas with deficiencies. 7/21/2003 10:26:55 AM
INSP-Sprinkler Rough-in/Hydro7/17/20037/18/20037/18/2003PFAIL
DetailsTroy Cobbley
Rough-in inspection performed on the east, west and south wings. North wing still needs to be done. Separation between the east wing and the living area is an issue. Earthquake bracing needs to be moved to the top chord of the trusses or get engineering sign off. Extended coverage sidewalls not installed. 7/18/2003 2:03:02 PM
INSP-Supply line flush6/24/20036/25/20036/25/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/24/2003 at 4:00:39 PM. Contact: ###-####. not a flush; thrust block at base of riser okay; pictures of UG not developed yet 6/25/2003 2:19:25 PM
INSP-Supply line flush6/20/20036/23/20036/23/2003ACANC
DetailsTroy Cobbley
Debest will call when the thrust blocks are ready for inspection. Due to high water table pipe will be buried as it is installed and pictures will be taken and shown to the inspector before sign off 6/23/2003 2:25:25 PM