Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR03-00139
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 252 E FRONT ST
Project NameSPR CIVIC PLAZA PA-2 (6 OF 6)
Customer Number 
ePlanReview 
Description
Civic Plaza Apartments PA-2 * (Section 6 of 6) * To install fire sprinklers in Section 6 of 6, within a 5 story, 29 unit apartment structure, @ 4,180 ft/2 per floor, with two four-hour area separation walls to divide this structure into six separate buildings, above a three-hour occupancy separation. This building is fully fire sprinklered for story increase. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-00375.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/24/20042/24/20042/24/2004PPASS
DetailsRick Jackson
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
INSP-Final Inspection2/24/20042/24/20042/24/2004PPASS
DetailsRick Jackson
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
INSP-Final Inspection2/19/20042/20/20042/20/2004AFAIL
DetailsRick Jackson
Please call Mike prior to inspection; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2/20/2004 4:21:07 PM will final 2/20/2004 4:23:27 PM need all trim completed 2/20/2004 4:24:37 PM
INSP-Sprinkler Rough-in2/18/20042/18/20042/18/2004PFAIL
DetailsRick Jackson
performed walk through of all floors and the following need to be completed - signage on all valves, etc.; test jockey/pump operation with all supervised valves; elevator rooms need canopies on heads and at top of stairs; standpipe not extended to roof per plans; caps on all standpipe outlets; 4th floor room between elevator and stair has head at angle; 3rd floor trash room has tape on head; exposed CPVC pipe in 2nd floor meter room for drops and at pipe to dry sidewall; could not gain access to all rooms so this is not all inclusive 2/18/2004 1:03:20 PM
INSP-Sprinkler Rough-in/Hydro2/10/20042/11/20042/11/2004APART
DetailsRick Jackson
hydro okay 2/11/2004 11:38:03 AM
INSP-Sprinkler Rough-in/Hydro2/6/20042/10/20042/10/2004AFAIL
DetailsRick Jackson
Scott Carter 6 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:54:55 PM 2/10/2004 3:56:53 PM
INSP-Sprinkler Rough-in/Hydro10/27/200310/28/200310/28/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/27/2003 at 1:36:58 PM. Contact: ###-####. hydro on standpipe okay 10/28/2003 12:59:26 PM
INSP-Sprinkler Rough-in/Hydro10/16/200310/17/200310/17/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/16/2003 at 4:10:07 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping at corridor needed 10/17/2003 10:17:40 AM
INSP-Sprinkler Rough-in/Hydro10/15/200310/16/200310/16/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/15/2003 at 12:58:22 PM. Contact: ###-####. straps needed 628/609/room for construction elevator; elevator machine room requires SR heads - not QR 10/16/2003 4:02:51 PM
INSP-Sprinkler Rough-in/Hydro10/14/200310/15/200310/15/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/14/2003 at 11:41:05 AM. Contact: ###-#### okay to cover rooms; firestopping needed in corridor 10/15/2003 11:09:13 AM
INSP-Sprinkler Rough-in/Hydro9/10/20039/11/20039/11/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/10/2003 at 8:39:36 AM. Contact: ###-####. okay to cover rooms; corridor requires firestopping; standpipes over 48 inches high 9/11/2003 12:33:14 PM
INSP-Sprinkler Rough-in9/4/20039/4/20039/4/2003APART
DetailsRick Jackson
okay to cover rooms; corridor pipe not restrained to prevent upward movement; fire stopping required in corridor 9/4/2003 8:57:17 AM
INSP-Sprinkler Rough-in/Hydro8/29/20039/2/20039/2/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:38:18 PM
INSP-Sprinkler Rough-in8/27/20038/28/20038/28/2003APART
DetailsRick Jackson
pipe in corridors has excessive upward movement - need to restrain; rooms okay to cover on second floor only 8/28/2003 11:03:54 AM 8/28/2003 11:05:26 AM
INSP-Sprinkler Rough-in/Hydro8/26/20038/27/20038/27/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/26/2003 at 10:28:33 AM. Contact: ###-####.
FIR-Aging Inspection7/7/20037/7/20037/7/2003 PASS
DetailsRick Jackson
work is still in progress 7/7/2003 8:03:59 AM