Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR03-00144
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameSPR Micron Building #26
Customer Number 
ePlanReview 
Description
Micron Building #26 - To remove and reinstall 260 sprinklers for the conversion which includes the removal of a "coffered" to a Lay-In Grid ceiling, of approximately 30,000-ft/2, of the second floor office area of building #26 to a manufacturing area. This work is located between grid lines 11&15 and B&M. (There is also a small alteration at the first floor between grid lines 12&13 and B&C, which is NOT included in this fire permit, since it was not addressed herein). The fire sprinkler system work shall be installed in accordance to NFPA 13-1999, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to garage shell permit: BLD03-00175.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/1/20047/1/20047/1/2004APASS
DetailsRick Jackson
INSP-Sprinkler Rough-in6/19/20036/19/20036/19/2003APART
DetailsRick Jackson
phase A okay
INSP-Sprinkler Rough-in/Hydro6/16/20036/16/20036/16/2003PFAIL
DetailsRick Jackson
4 inch needs additional EQ